ST1002-CS100201
(10/13/2011) Keith Marvin - Re: Old Town - Utility Plan and Cost EstimatePage 1
From:
Keith Marvin
To:
Thornhill, Caleb
CC:
Hatley, Tricia
Date:
2/1/2010 9:33 AM
Subject:
Re: Old Town - Utility Plan and Cost Estimate
Caleb,
Please send me the revised contract as soon as possible.
Also, I was able to download the plans for Bethel, but I didn't see the contract documents.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> Caleb Thornhill <bct@freese.com> 1/29/2010 12:26 PM >>>
Keith,
Sorry again about today. I left you a message. I've wrenched my back something fierce. It's started last
Sunday while cleaning out the garage and now just pops up out of the blue. I look like the hunch back
walking around. I'm going to run to the Dr. and see if I can get some sort of muscle relaxer.
Bethel:
* I've posted the Bethel Plans on our FTP site. I'll plan on coming out there early next week, but this
will give you some time to review. There are a couple of clean up items, but barring any major comments
should be able to sign them next Friday. Here are the instructions on how to get to the files:
.
* I talked with our Construction Services about the bridge incentive. The suggest was to modify the
"Time Bid". Have a B.1 (overall time) and a B.2 (bridge time). We would have to define the bridge
calendar days. The only concern is providing incentive to complete a major structure. We don't want to
sacrifice quality. Call my cell phone and we can discuss your thoughts.
Coppell:
* Structures is looking at the headwall detail and the plan and profile for Culvert B. He's supposed to
get back with me 1st thing Monday or Tuesday.
* I've attached a memo for the earth work calculations. Let me know if it's enough detail and
provides you enough information. If not, an alternative would be to cut some cross sections every 100 ft
(10/13/2011) Keith Marvin - Re: Old Town - Utility Plan and Cost EstimatePage 2
and get an average end-area rough calc.
Old Town:
I've attached the cost estimate and the Utility Plan layout. Please review both and let me know if you
have any questions. If there aren't any major concerns, I can get a revised scope and fee to you first
thing next week.
Sorry again about today. Call me on my cell if you want to discuss: 214-952-9562. Get me before I get
on the muscle relaxers.
B. Caleb Thornhill, P.E.
Freese and Nichols, Inc.
1701 N. Market St., Suite 500
Dallas, Texas 75202
* Main: 214-217-2200
* Direct: 214-217-2282
* Fax: 214-920-2565
* Email: bct@freese.com<mailto:bct@freese.com>
________________________________
This electronic mail message is intended exclusively for the individual or entity to which it is addressed.
This message, together with any attachment, may contain the sender's organization's confidential and
privileged information. The recipient is hereby notified to treat the information as confidential and
privileged and to not disclose or use the information except as authorized by sender's organization. Any
unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or
other use of, or taking of any action in reliance upon, this information by persons or entities other than the
intended recipient is prohibited. If you received this message in error, please immediately contact the
sender by reply email and delete all copies of the material from any computer. Thank you for your
cooperation.
LEGEND
PROPOSED PAVEMENT
OLD TOWN COPPELL - MAIN STREET
PROPOSED SIDEWALK
INFRASTRUCTURE IMPROVEMENTS
PROPOSED WATER LINE
(1974 LF 8", 1291 LF 10")
JAN. 28, 2010
DATE:
PROPOSED SEWER LINE
JMR
DRAWN BY:
(2382 LF 8")
REVIEWED BY: