Loading...
ST9304-CS 880913COPPELL PUBLI~ ~ORKS September 13, 1988 TO: Russell Doyle, City Engineer FROM: Steve Goram, Director of Public Wot RE: E. Beltline Bridge @ Grapevine Cre _J It has come to my attention that there is a minor problem in the structure of the bridge referenced above. Street Foreman Per Birdsall discovered a potential problem in one of the pier caps during inspection of the bridges throughout the City. The pier cap which is the second bent from the west has an eroded area on the west side of the cap. It involves several square feet and reinforcement steel is exposed. Per Birdsall has met with Mike Sharp of Dallas County Road & Bridge District 1 to review the situation. Mr. Sharp did not feel it was a critical problem but load posting could be in order after analysis by Engineering staff. The bridge is scheduled for replacement when Beltline Road is completed which according to John Karlsruher of Ginn, Inc. should be in 3-4 years. Please review this situation and respond back to me with your findings. If you need additional information, Birdsall at the Service Center. please contact myself or Per SGG/sm cc: Per Birdsall, Street Foreman