Loading...
ST8805-CS 880608Jerry Parch Consulting En neers June 8, 1988 Mr. Wayne Ginn, P.E. Flood Plain Administrator City of Coppell 17103 Preston Road, Suite 100 Dallas, Texas 75248 214/a48-4900 RE: JP No. 88009~ Parks of Coppall~ Floodplain Regulations; Coppoll, Texas Dear Wayne: On Thursday, June 2, 1988, Mr. Jay Chester of ARQ Development and I met with Mr. Mike Allen of Univeat Development Company to discuss several issues related to the future development of the property recently acquired by ABQ in Coppell. This letter is provided to inform you of our discussions with Mr. Allen regarding flood plain regulations of the City applicable to this property and to request additional clarification of the criteria that will be used to evaluate any proposed flood plain modifications within ABQ property west of Denton Tap Road in order that we may prepare our studies in compliance with the requirements..of the City. It is my understanding that the property purchased by' ARQ Development south of Cottonwood Creek and east of Denton Tap Road, which essentially consists of the Univest property in this area excluding the "Town Center" Tract, or Tract 7, as it is commonly referred to, has been previously recleimad from the flood plain. Official notification of this is documented in a letter from the Federal Emergency Management Agency to Mayor Leu Duggan of the City of Coppell dated September 24, 1987. Mr. Allen provided us with a copy of this letter. We did not receive a copy of the enclosures however. Mr. Allen also provided us a copy of a letter dated April ld, 1988 from him to you requesting exemption of tho unreclaimed portions of the PCJV property from the provisions of tho City's recently adopted Flood Plain Management Ordinance. This exemption is pursuant to Section A of Article 3 of this ordinance. By evidence of your signature at the bottom of Mr. Allen's letter, it is our understanding that the City of Coppell has Agreed and Confirmed this exemption. Mr. Allen also provided us a copy of your letter to him dated May 25, 1988, transmitting a letter dated Hay 3, 1988 from FEMA, which, according to your letter, allows the City of Coppell authority to interpreters its Flood Plain Ordinance without Jeopardizing its status in tho 6001 UV. Interstate 20. Suite 209, LB 32 · Arlington. Texas 76016 · Metro (817) 572-3458 · 18171 561-2108 ' Mr. Wayne Ginn, P.E. JP No. 88009 June 8, 1988 Page 2 of 3 flood insurance program. Since the proposed flood plain modifications will not be evaluated under provisions of the October 16, 1987 Flood Plain Management Ordinance, I request that you provide a letter to me stating the criteria under which the proposed reclamation and other proposed construction in the flood plain within the exempted property will be evaluated. More specifically we request the following: A. A copy of the HEC II model(s) and output data of Cottonwood Creek and Denton Creek from the downstream side of the Denton Tap Road bridges through ABQ property, and extending upsteam of the ABQ property west of Denton Tap Road. The information should include discharges of multiple frequency floods to be used in our modelling of the proposed improvements and include 100-year flood plain and floodway elevations, as well as 500-year flood elevations, to be used by the City and FEMA in evaluating the hydraulic response of the modified flood plain. I understand that several studies have been done on the subject stream reaches including a study by Carter & Burgess in 1982, Threadgill-Dowdey in June, 1987 and Anderson Engineers, Inc. in 1987. By this request, I would like you to clarify for us the hydraulic model that provides the proper base flood conditions that will be used by the City and FEMA to evaluate the proposed flood plain modifications. B. Please inform us of the hydraulic design requirements of the proposed Parkway Boulevard Structure over Cottonwood Creek. This should include discharges to be analyzed, freeboard requirements, velocity requirements, or other hydraulic design criteria, if any. c. Since the criteria for evaluation of flood plain modifications stated in the October, 1987 ordinance will not be applied to this project by the City, please inform us of any ordinance or other published criteria that will be applicable. If the project will be evaluated solely on the basis of FEMA criteria, please advise. D. Please inform us of the city requirements regarding minimum finished floor elevations of proposed structures in areas adjacent to flood plain areas, if any. E. Please advise us of the name of the staff member of either the city or your office to whom we should direct our submittals and will coordinate with us in reviewing our project. _ !Mr Wayne Ginn, P.E. JP No. 88009 June 8, 1988 Page 3 of 3 Thank you for your cooperation and assistance in this matter. We would appreciate your written response to the requests stated herein, so that we may have this documentation in our files, by June 17, 1988. If you have any questions or if you are not in agreement with the understandings stated herein, or wish to discuss these topics further, please call. Sincere~ , JP:ch cc: Mr. Jay Chester/ABQ Development