Loading...
ST8505-CS 880929GINN, INC. CONSULTING ENGINEERS September 29, 1988 SEP ?. 9 1988 Mr. Russell Doyle, P.E., City Engineer City of Coppell ~-~ P.O. Box 478 Coppell, TX 75019 Re: Don Poulsen - Complaint Verbally registered to Alan Ratliff, 9/22/88, 10:15 a.m. Dear Russell: The condition of the detour was addressed with the contractor on the afternoon of 9/22/88. Thereafter, the contractor addressed the situation by adding flexbase to the area of concern and smoothing out the ramps over the median. The signage was addressed with the contractor on Wednesday, 9/28/88. Improving the visibility of the existing signage and installation of a "Bump" sign at the median crossover were both requested of the contractor. On Thursday, 9/29/88, the contractor added a "Bump Ahead" sign on Southwestern Blvd. for advance warning purposes. ~ /~he traffic is currently planned to be switched on Tuesday, /10/4/88, from the existing Southwestern Blvd. pavement to the new ~ temporary asphalt connection to Belt Line Road. This switch will ~ alleviate the need for the crossover at the median currently \being used. We hope this appropriately addresses the concerns presented by. Mr. Poulsen. Sincerely, /~ ~ Kevin Peiffe~~ cc: H. Wayne Ginn File 255 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900