Loading...
ST8805-CS 850521May 21, 1985 Mr. Wayne Glan GINN ENGINB~RING 16135 Preston ~oad Suite 106 Dallas, Texas 75240 Dear Wayne= Enclosed please fin~ the items and estimate for propose~ extension of Parkway Blvd. across the Park frontage, north lane. Please note the following: A. The 16n water line quantities are taken from your plans for the completion of this line. B. Remaining paving, etc. are taken from THI~ADGILL & DOWDY plans for this section of road including completion of storm drainage structures directly associated with Park site development. C. I have'included, for your reference, the list of improve- ments which are already in place and for which UNIVEST has alrea~ received reimbursement from the city. D. Please note the unit prices I have used are representative of current bid price. Actual costs may.vary ~epe~e~t on real bids from contractors. In addition to the enclosed 'paid' costs, are overhead engineering ar~! fees of $1,475 for N~D £ees &~ $~,1&1.03 for e~lneerin~. There wall ~e a~itio~l e~~ri~, M~ and testi~ f~s at ~he t~ of ~nst~~~i~ can,t pin, iht at this tiM. I hope this will get you started. call me. If you have any questions, please Respectfully, Enclosures ' CTC/ldf ~ t.~ ~mwaY / s~ [ - ~ SITE PARKWAY BLVD. COST N. LANE FUTURE COST 5-14-85 CTC Pavement 100% Cost 6"Conc S.Y Lime prep. SY Lime TON 16" Water 1/2 Cost 16" LF 16"Valve 6" 6v Fire Hydrants Fittings TON 2636.94 2921.73 40.87 1031.75 2 4 4 1% Storm Sewer 6' curb inlet ea. 2% 15" RCP LF 10 18" RCP LF 40 'TOTAL .ESTIMATE iDLUS ~ENG~NEERING 15.00 1.20 80. O0 34.00 1800.00 275.00 650.00 1500.00 1500.00 18.00 22.00 39,540.00 2,922.93 .3,269._60 35,079.$0 3,600.00 1,100.00 2,600.00 2,250.00 3,750.00 180.00 880.00 $37,835.01 $ 44,629.50 $4,8!0.00