ST8805-CS 850521May 21, 1985
Mr. Wayne Glan
GINN ENGINB~RING
16135 Preston ~oad
Suite 106
Dallas, Texas 75240
Dear Wayne=
Enclosed please fin~ the items and estimate for propose~ extension
of Parkway Blvd. across the Park frontage, north lane. Please
note the following:
A. The 16n water line quantities are taken from your plans
for the completion of this line.
B. Remaining paving, etc. are taken from THI~ADGILL & DOWDY
plans for this section of road including completion of
storm drainage structures directly associated with Park
site development.
C. I have'included, for your reference, the list of improve-
ments which are already in place and for which UNIVEST has
alrea~ received reimbursement from the city.
D. Please note the unit prices I have used are representative
of current bid price. Actual costs may.vary ~epe~e~t on
real bids from contractors.
In addition to the enclosed 'paid' costs, are overhead
engineering ar~! fees of $1,475 for N~D £ees &~ $~,1&1.03
for e~lneerin~. There wall ~e a~itio~l e~~ri~,
M~ and testi~ f~s at ~he t~ of ~nst~~~i~
can,t pin, iht at this tiM.
I hope this will get you started.
call me.
If you have any questions, please
Respectfully,
Enclosures '
CTC/ldf
~ t.~ ~mwaY / s~
[
- ~ SITE
PARKWAY BLVD.
COST N. LANE
FUTURE COST
5-14-85
CTC
Pavement 100% Cost
6"Conc S.Y
Lime prep. SY
Lime TON
16" Water 1/2 Cost
16" LF
16"Valve
6" 6v
Fire Hydrants
Fittings TON
2636.94
2921.73
40.87
1031.75
2
4
4
1%
Storm Sewer
6' curb inlet ea. 2%
15" RCP LF 10
18" RCP LF 40
'TOTAL .ESTIMATE iDLUS ~ENG~NEERING
15.00
1.20
80. O0
34.00
1800.00
275.00
650.00
1500.00
1500.00
18.00
22.00
39,540.00
2,922.93
.3,269._60
35,079.$0
3,600.00
1,100.00
2,600.00
2,250.00
3,750.00
180.00
880.00
$37,835.01
$ 44,629.50
$4,8!0.00