Loading...
2001_0906 // WATER pc t, �o Issued: 0 0 � Finished:I - 1p - Emplo Grid ma Name: Address: 02 LR Phone Number. (HM) (WK): Check for. Accuracy test: Meter Leak: Check water pressure: Initial mete: relocation inspections Re -read 1. $ackflow Insp. 2. Repair 3. Maintenance 4. Other Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: ' 5 D /6 Ai 3 � e-1 err c hc",i r7u+ 7. If Meter:Ser ice Leak: Classify: - City: Customer A. Water Lou (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment Used 8. If Meter Caa ge Out: Unit # Miles Hrs Equipment A. Old Meter ; ' )..rog 3 ( Reading v A213 2 0 /0 3Rd B. New Meter # Rea C. Old Meter SizeI Type: pi 247.57 New Meter Size/Type S /`' E. Type of work performed or findings: 9. If mainline or deep service re -,air, describe type of pipe or service line and condition: 10. Man- hours: I R S Crew Members. 11. List MateraLs Used: 12. If you had an accident/Inc:dect while performing this request. Did you repot. it? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How many trips to do task? Signature mCi