Loading...
ST8505-AG 890926Rev. 4-24-89 THE CITY WITH A I BF. AUTIFUI. FUTURE AGENDA REQUEST FORM CItY COUNCIL MEETING 9/26/89 ITEM CAPTI( SUBMITTED BY: (~irector"s Signature) ' " EVALUATION OF ITEM: ration of final payment and release of retainage on ~ Engineer OTM,'~ ~.: Wayne Ginn DA~tl~ 9/22/89 Staff concurs with recommendation of the consulting engineer to release 'final retainage in the amount of $55,604.13. BITDGET AMT.: COM3~ENTS: AMT. ESTIMATED: FINANCIAL REVIEW BY: LEGAL REVIEW BY: AGEh~A REQ FORM. 0588D$ REVIEWED BY CM: GINN, INC. August 25, 1989 CONSULTING ENGINEERS Mr. Frank Trando city of Coppell P.O. Box 478 Coppell, TX 75019 Re: Belt Line Road Final Application for Payment Dear Mr. Trando: Enclosed are 4 copies of the Final Payment Request (No. 26) for the above referenced project. Our office has reviewed this request and concur that the final contract amount is $5,650,587.94 as shown. It is our recommendation that $250,000 of retainage be released at this time and that the City hold $55,604.13 until the Final Punch List items are corrected and the City accepts the project. Enclosed also are the Final Close-Out Documents which include Consent of Surety, Waiver of Lien certifying that all labor and materials are paid for, and various correspondence. Under separate cover we are transmitting final sets of record drawings to the Department of Public Works. We will advise your office when the project is ready for acceptance and when to release the final retainage. Sincerely, Alan D. Ratliff Russell Doyle, P.E. Steve Goram File 255 17103 Preston Road ·Suitc 100 · LB 118 · Dallas, Tcxas75248 ® Phone 214/248-4g~0 GINN, INC. CONSULTING ENGINEERS September 18, 1989 Mr. Alan D. Ratliff, City Manager City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Belt Line Road Release of Retainage Dear Mr. Ratliff: Ed Bell Construction Company has completed the removal of the weeds on the Belt Line Road project as directed by the City Council on September 12, 1989. It is our recommendation that the City now release the final retainage and assume maintenance. If this action requires Council action, we request that it be placed on the next available agenda. By previous correspondence, all of the final closing documents have been supplied. If you need any additional information, please advise. Since~re~y, H. Wayne Ginn, P.E. HWG/dsp cc: Mike Albert - Ed Bell Construction Co. Steve Goram File 255 17103 Preston Road ® Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 · TELEX 82,0590 FA;~,-(2t 4) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 t0505 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS. TEXAS 75220 September 14, 1989 Ginn, Inc. 17103 Preston Road Suite 100, LB 118 Dallas, Texas 75248 ATIIN: Mr. Wayne Ginn, P.E. RE: Beltline Road South Gentlemen: As of this date, we have removed the existing weeds from the mulch areas as requested by the City Council of the City of Coppell. We hope that the city has initiated their maintenance program as the grass and landscape areas need i~mediate attention. Should youhave any questionm regarding this matter, please contact us. Very truly yours, ~l) BELL CONSTRUCTION CGMPANY ~. M. Albert President AN EQUAL OPPORTUNITY EMPLOYER GINN, INC. CONSULTING ENGINEERS September 7, 1989 Mr. Alan D. Ratliff, City Manager City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Belt Line Road South Dear Mr. Ratliff: The Belt Line Road South project is now complete. The Contractor has completed all of the punch list items. At this time, it is our recommendation that the City release the final retainage in the amount of $55,604.13. We believe that with professional maintenance performed by the City, this landscape will continue .to mature and improve in appearance. The City now has a quality project of which it can be proud. If you need any additional information, please advise. Sincerely, H. Wayne Ginn, P.E. HWG/dsp cc: Russell Doyle, P.E. Steve Goram Frank Trando File 255 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900