ST8505-AG 890328SUBMISSION DEADLINE: R~¢.: Effective 1/20/88 II. p.m. Monday - 8 Days Preceding Uity~ Councli Pleetxng 1'~ AGENDA REQUEST FORM FOR CITY COUNC~C ME~TING: ~arch ITEM CAPTION Discussion and consideratit~f--Chan~e Order No. Seven (7) for the Belt Line Road (South) Improvement project and authorizing the Mayor to sign. III. ACTION RECOMMENDED : Approval IV. REP. IN ATTENDANCE A: STAFF - Russell Doyle, P.E., City Engineer B: OTHER - Kevin Peiffer, P.E., Proj. Eng. (Ginn, Inc.) v. NOTIFICATION TO : N/A VI. METHOD OF CONTACT : DATE : FINANCIAL REVIEW : 1. BUDGETED ITEM 2. BUDGET AMOUNT 3. ESTIMATED AMOUNT FOR THIS ITEM 4. AMOUNT OVER OR UNDER BUDGET 5. LOW BIDDER RECOMMENDED : xxx YES : $1S,627.04 : $15,627.04 : ~239,242.70 NO YES NO SOURCE OF FUNDING CO'S OR BONDS FUNDS (Series or year authorized) OPERATING BUDGET (Account Number) OTHER : Bond Funds and CO's : 1984 / 1986 APPROVED BY CITY MANAGER : ITEM NqJMBER AGENDA REQUEST FORM 13M~AWD I' ........................ GINN, INC. CONSULTING ENGINEERS March 20, 1989 Mr. Russell Doyle, P.E. City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Belt Line Road (South) Improvements Change Order No. Seven (7) - Power Supply for Irrigation System Dear Mr. Doyle: Please find Change Order No. Seven (7) enclosed for the above referenced project. This Change Order allows for providing power to the irrigation controllers in the medians. We respectfully request this item be placed on the March 28, 1989 council agenda for their consideration. The original plan (Change Order No. Six (6)) was to provide power to the irrigation controllers from the street lights in the median. TU Electric has advised, however, that since the City does not plan to light the whole street at this time, they will not install wire and supply power in the entire median at present. There will only be power furnished where lights are erected (ie. at the street intersections). Also, even if power was in the median now for the lights, TU Electric said the power would only exist when the photoelectric cells were activated and thus, the City would not be able to work on the system during the daytime (for trouble shooting, etc.). As a result, alternate power sources are needed to provide power to the irrigation system. While Change Order No. Seven (7) results in an increase, the overall project is still within the original budget. Attached is a tabulated summary of the approximate Belt Line Road (South) budget and costs to date. Since funds are available at this time, we recommend approval of Change Order No. Seven (7). Please call if you have any questions. Sincerely, Kevin if re . / KP/dsp cc: Steve Goram H. Wayne Ginn, P.E Frank Trando File 255 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900 Estimated Summary Belt Line Road (South) Capital Improvement Project ITEM BUDGET CIP $3,660,000 Dallas Co. $700,000 Certificates of Obligation $2,100,000 Total Original Budget $6,460,000 Less Funds Withdrawn 2/14/89 for Belt Line Road (E/W) $75,000 Total Adjusted Budget $6,385,000 (interest not included in figure) ITEM COSTS TO DATE Original Construction Total Change Orders #'s 2-4 Engineering & Inspection Total Obligated Cost to Date Change Order #6 Change Order #7 Total Estimated Project Cost Net Surplus $5,540,642.41 (42,967.03) $590,000.00 $6,087,675.38 $42,454.88 $15,627.04 $6,145,757.30 $239,242.70 (interest not included in figure) Note: Change Order No.'s 1 and 5 are not included in the above figures since appropriate funds were escrowed with the City by Connell Development Co. and St. Louis Southwestern Railroad, respectively, for this work. (Instructions on reverse side) CHANGE ORDER ~' No. Seven ~7) PROJECT: Belt Line Road (South) Improvements DATE OF ISSUANCE: March 28, 1989 OWNER: City of Coppell P.O. Box 478 (Name, Coppell, TX 75019 Address) CONTRACTOR: Ed Bell Construction Co. OWNER's Project No. ENGINEER: Ginn, Inc. (Kevin Peiffer, P.E.) CONTRACT FOR: Belt Line Road Improvements IH 635 North to Denton Tap Rd. ENGINEER'sPr~cctNo. 255 You are directed to make the following changes in the Contract Documents. ~Description: Install conduit, pole risers, meter bases, wire and other ndscellaneous appurtenances for a complete installation to provide power from the po.wet sources located in the parkway along Belt Line Rd. over to the irrigation .~. comtrollers in the median. Purpose ol ~nange uruer: Provide alternate power source for the irrigation controllers since TU Electric will not allow tie-in to the power provided to the street lights in the median. Attachments: (List documents supporting change) Contractor's Item List with Unit Prices CHANGE IN CONTRACT PRICE: Original Contract Price S,S40,642.41 $ Previous Change Orders No. one $ · 248,314.18 to No. Contract Price prior to this Change Order 5,788,956.59 $ Net Increase '" ....... ' of this Change Order 1S,627.04 $ Contract Price with all approved Change Orders $ $,804~583.63 six CItANGE IN CONTRACT TIME: OriginalContractTime Subst. completion date was 9/21/8~ C.0, #6:84 calendar days o Notice to Proceed w/C.O. #6 was 1/16/89; comp1. date 4/9/89 d.yso, da, e NetchangefrompreviousChange Orders none days (since subst, compl.) Contract Time Prior to this Change Order (credit for bad weather days 84 calendar days nnt r~l~c~a ~n ~,m.,ro0 days or date Net Increase (decrease) of this Change Order none days Contract Time with all approved Change Orders (credit for bad weather days 84 calendar days. n~t raFl~ct~d in Figure) days or dale RECOMMENDED: by . -- Eng~ccr/ / EJCDC No. 1910-8-B (~)83 Edition) APPROVED: APPROVED: by by Owner Cunlractor Prepared by the Engineers' Joint Contract Doc.menEs Committee and endorsed by 1'lie Associaled General Contractors of America. *T E~LEX 820590 ATTACHMENT FOR: CHANGE ORDER SEVEN (7) ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10215 GARDNER ROAD DALLAS. TEXAS 753§4-0787 TELEPHONE (2t4! 556:1475 February 21, 1989 Ginn, Inc. 17103 Preston Rd. Suite 100, LB 118 Dallas, Texas 75248 ATIN: Kevin Peiffer RE: Beltline Road Coppell, Texas As requested, a Schedule of Values is shown below, to provide power to eight controllers as noted in our letter dated February 13, 1989. Schedule of Values Meter base and panel riser with Weatherhead 8 EA@ $888.38 = $ 7,107.04 2. 1" PVC with 3-~8 THHN 1000 LF@ $ 4.90 = $ 4,900.00 3. Trenching 680 LF@ $ 2.50 = $ 1,700.00 4. Bore with 2" PVC Conduit 160 LF@ $12.00 = $ 1,920.00 TOTAL $15,627.04 Should you need any additional information, please contact US. Very truly yours, ED BELL CONSjI~CTION CIIMPANY U. M. Albert President JMA/gh AN EQUAL OPPORTUNITY EMPLOYER