ST8805-CS 890710Jerry Parchd Consulting Engineers July 10, 1989 Mr. Buddy Echols Superintendent Coppell Independent School District 1201 Wrangler Drive Coppell, Texas 75019 214/471-1111 RE: "' ~ l/t f,, JP No. 880231 Parkway Boulevard and High School Access Road; Coppell, Texas Dear Mr. Echols: On Friday, July 7, 1989, I visited the site to review the Paving and Utility construction on the referenced contract. This date is 88 days from the project start date which was April 10, 1989. The contract time is 120 calendar days. Contract completion date is August 7, 1989. I reviewed the site with Mr. Larry Davis, construction inspector with the Engineering Department of the City of Coppell. The contractor, L. H. Lacy Company, had recently completed all concrete paving operations with the exception of the connection of the driveway from the High School site to the High School Access Road. During my visit, workmen arrived at the site and appeared to be grading the subgrade for this connection. No other construction was underway during my visit. Mr. Davis had concerns regarding the appearance of the median nose concrete on the east side of the Parkway Boulevard/High School Access Road intersection. The median nose should have a three foot radius in accordance with the plans. The constructed shape appeared irregular. Mr. Davis will direct the contractor to remove the median nose concrete at this location and replace it accordance w~th. the plans. From visual observation, the following work remains performed under this contract. to be Install brick pavers at the Parkway Boulevard/High School Access Road intersection. (Brick pavers in Parkway Boulevard at the Denton Tap Road intersection are to be installed under the City of Coppell Denton Tap Road project). 2. Adjust fire hydrants and valve covers to finished grade. 320 VVestway Place, Suite 501 · Arlington, Texas 76018 · Metro (817) 467-2418 · (817) 465-0259 Mr. Buddy Echols JP No. 88023 July 10, 1989 Page 2 of 2 Install traffic buttons, jiggle bars, and stop bars in the street pavement. 4. Install cable markers at conduit ends. 5. Construct inlet tops. 6. Install barricade at the west end of Parkway Boulevard. 7. Install wire fence· 8. Provide stand of Bermuda Grass in areas to be seeded. The list of items given above is only construction remaining on the project. remain in addition to the items above. meant to point out key Other items of work may We are currently awaiting results of the 28 day concrete strength tests in order to verify compliance of concrete strength with specifications. Twenty-eight day concrete strength test results should be available around July 25, 1989. Surveyors will check the grade of the constructed streets this week. Once it is known that the concrete strength is acceptable, the street grade is verified and brick pavers are installed, the City and contractor may open the constructed roadways to traffic. If you have any questions, please call. S.incerely,/-% . . JP:ch cc: Mr. Jay Chester, P.E./ABQ Development Corporation Mr. Russell Doyle, P.E./City of Coppell Ms. Vonita White/Coppell Independent School District Mr. Steve Goram/City of Coppell Mr. Larry Davis/City of Coppell Mr. Skid Klement/L. H. Lacy Company