Loading...
ST8505-CS 880906GINN, INC. CONSI.)'LTING ENGINEER, September 6, 1988 Mr. Frank Trando city of Coppell P.O. Box 478 Coppell, TX 75019 Re: Belt Line Road Improvements Application for Payment No. 17 Dear Mr. Trando: Enclosed are three (3) copies of Application for Payment No. 17 in the amount of $296,613.85 from Ed Bell Construction Company, representing work performed on the above referenced project through July 31, 1988. We have reviewed this application and recommend that payment in full be made at this time. In addition, please be advised that the work described under Change Order No. One (1) has been completed. This work is to be funded by Connell Development Company via an existing escrow account. At this time, it would be appropriate to draw upon the escrow account. The City should have the escrow agreement on file. We shall provide you, in the next few days, a detailed summary of quantities and costs under separate memo. Sincerely, X'"~C "'") "/ H. Wayne Ginn, P.E. HWG/dsp enclosure: 3 pay applications cc: Ai~~. ~atliff c~M~ark Connell, Connell Development Co. Jim Koch, Powell & Powell Engineers Ed Bell Construction Co. Kevin Peiffer w/enclosure Randy Fleming w/enclosure Walter Ellison w/enclosure File 255 w/enclosure 17103 Ih-cslon ilo;id · Suite I00 · 1Al ll,q · 1)alias, Texas 75248, · I>honc 214/248-4900