Loading...
ST8505-CS 880829 GINN, INC. August 29, 1988 Mr. H. W. Baker Ed Bell Construction Co., Inc. p.O. Box 540787 Dallas, TX 75220 Re: Belt Line Road improvements Change Order No. Five (5) Dear Bud: The City of Coppell advised us on August 26, 1988 that the funds and legal instruments needed for the above referenced work have been received as of August 26, 1988. By receipt of this letter, you are hereby issued a Notice-to- Proceed with construction for the above referenced work, Change Order No. Five (5), on or before September 1, 1988. This work shall facilitate a temporary roadway connection from existing Southwestern Boulevard to the new intersection of Belt Line Road/ Denton Tap Road. Enclosed are 3 sets of construction plans for your use. Per the change order, 30 calendar days are allocated for this work. The Belt Line Road contract, which will now include the Change order No. 5 work items, establishes September 30, 1988 as the new contract completion date. A fully executed Change order instrument is enclosed for your records. Please call if you have any questions. sincerely, /~ % Kevin Pei g.er KP/dsp cc: Mayor and council Alan D. Ratliff, city Manager Frank Trando, Deputy city Manager/Finance Director Russell Doyle, P.E., city Engineer Pat Acker, P.E., Albert Halff & Assoc. H. Wayne Ginn, P.E., Ginn, Inc. Randy Fleming, chief Field Representative, Ginn, Inc. I'h~m' 2 1.1' qd~q-'lt)li(} 17 1[~3 lht'sl¢~ll I~t~;Id ~ .quilt I()() ® II~ I I,q ~ I);dlas. 'l'cx;,s 7 ~..d,q ~ · '