Loading...
2001_0516 .» • W Al Issued: s._ Finished: _5z/6 .n/ employee: Grid map: _.----- Name: Phone Numcer: {I�Q Address: _200 a S , i Tltir� E Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. $ackilow last'. 2. Emir 3. Maintenance 4. Other Backflow Lnsp. A. Main Line Below Cep Date A. Pump A. Line Locate B. Valves B. Water Tower . B. Line Locate Re - Cert. Date C. Service Line C. Samples C. Tap p D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: 7. If Meter, Service Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water Metered: Yes No C. Was Customer Notified: Verbally Doorknocker 3. If Meter C ange Out: Vehicle/Equipment used Unit ;Miles Hrs Equipment A. Ord Meter to 5 Cold Reading / Z U1 c B. New Meter .4 • _5g L Reading or)() () C. Old Meter Size.Type: /.�.{., - -n 1 k, D New Meter SizeiType t -c-j E. Type of work performed or findings: t ' 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Nfan -`c_:: Crew Me:n ( (97 B 11. List `•tattr:ais Used: 12. if you had a.: accident:.:: :dent while perfuming this request. D :d you report :c? Yes or no 13. Water Utilities meter inspection: pass or fail 14. How ,r.a..w trips to do ask? Signature