ST9304-CS 880713COPPELL PUBLIC WORKS
July 13, 1988
FROM:
RE:
Steve Goram, Director of Public Works
Steven M. Morton, Chief Developmental Inspector
MacArthur Blvd. Status
Steve, Terra's contractor, Cullum Construction are to complete the deficient
punch list items given to them on 6/24/88.
Sanitary sewer line has been jet rodded and debris (sand and pieces of concrete)
were removed systematically from manholes, as they jet rodded sections from
manhole to manhole all the way to the T.R.A. tie-in. Ail other items on the
punch list will be completed by next week and will be verified by the appropriate
departments.
The only unknown item will possibly be Parks.
he is satisfied with the medians.
Richard is to let me know when
SMM/bb