Loading...
ST9304-CS 880713COPPELL PUBLIC WORKS July 13, 1988 FROM: RE: Steve Goram, Director of Public Works Steven M. Morton, Chief Developmental Inspector MacArthur Blvd. Status Steve, Terra's contractor, Cullum Construction are to complete the deficient punch list items given to them on 6/24/88. Sanitary sewer line has been jet rodded and debris (sand and pieces of concrete) were removed systematically from manholes, as they jet rodded sections from manhole to manhole all the way to the T.R.A. tie-in. Ail other items on the punch list will be completed by next week and will be verified by the appropriate departments. The only unknown item will possibly be Parks. he is satisfied with the medians. Richard is to let me know when SMM/bb