ST9304-CS 880510t? ~.l~, 1988 Alan D. R~tliff, City Manager City of Coppell Report monthly report reflects the current status of each rn~'~rent active projects that we are working on for the c~,ppe]l~ we have prepared the info,etlon in'e~eoutive fo~- your convenience. We will be happy to' expand o~ ~nfor"m~-~uion p'uovided for any ParticUlar Projebt shoutd~ You so South) Consu:,'.'uction began March 2, 1987. ~cr. co'repletion date August 22, 1988. April 30, 1988: 63% work- completed, versus 78% cont'r-act time. ,~.;~t-;ed contract amount to date (with Change Orders) 864.91 . ..,'~tor currently completely sto~ sewer. Phase III of Cwo northbound lanes (Sanders' ~op northward) ~ed. cowboy Drive intersection paving c'ompl'eted; D~ive intersection shall be re-opened to traffic MaY · t.- ,. _..~'j.q'.hX.,~q'[_~ Road . :,::, ,... cic:i:.i c, n began September 1, 1987. -.~" ...... ~-L ¢o'mpleti~n date June 26, 1988. · ,. ~,3~..~.~1 c~mbract: amount $618,526.94. ..... ~.,,. Ap~'.[t 30, 1988: 89% work completed versus 80% ~'avi. n~3 on south half of roadway is completed, contractor curra,~tly performing clean-up, backfilling parkways, eLc. open ko two-way traffic approx. May 27, 1988. Sum; I00 · I.B 118 ~ l)alias, Texas 75248 · Pho.u 214/248-4900 contracts £or both segments awarded April 26, 198'8 to~LiH~ Lacy Co. (total amount $5,191,943.03). B~lt Line to Sandy Lake segment - estimated construction start June, 1988; complete June, 1989 (Contract amount $3,388,580,00). Sandy Lake to Denton Creek segment - estimated constz~ction start June, 1988; complete June, 1989 (Contract amount $1,803,363.03). Total project cost including traffic signals, street lights, landscaping, and RxR crossing etc. is approximatel~ $7,200,000.00. Agreements still pending with Conoco, Explorer, and St. T~uis Southwestern Railroad. Re-design of paving and drainage - MacArthur to West' overflow swale is 40% Complete. ',- '~ Dallas County would like to bid this portion of Belt Line Road with Carrollton's portion. Due to R.O.W. problems R x R, the county is currently re- designing the Carrollton portion of the project. Anticipated completion date for the re-design and subsequent bidding and construction is unknown at this time. Belt Line (E-W) relocation west of MacArthur - Awaiting final execution of City/Developer agreement. PROJECTS :~. 24". cross-towD Woter Line Design 82% complete. Anticipate completion of design end of June,_ 1988. Design in progress for segment along MacArthUr and Sandy Lake 'to new pump station site. Still awaiting City of Dallas design and route approval. Estimated construction cost $1,500,000.00. ~. ~rou~d Storage T~nk Design 85% complete. Anticipate bidding in late May 1988. Pt_imp ~t ~atio~l Design 25% complete. ~'4J. ll present revised bid and construction schedules .after · ~ank is bid. ~,~ISCELL~NEOU8 PROJECT8 Meadowrid~e Drainage Problem No change in status since .last report. Belt Line Traffic Signals Design and specs, completed. Bid: June 2, 1988. Scope: Permanent signals for Cowboy/Belt Tap/Southwestern/Belt Line intersections. Estimated construction cost $175,000.00. 10. ~i~hway 121 By-Pass Line and 11. No activity this period. Cotton Road Name Chanae No luther participation by Ginn, Inc. on:this project requested. City Attorney pursuing annexing south half of R.O.W~ at this time. Name change to be pursued by City staff thereafter for the east/west segment, west of IH635. 12. sub~Division Ordinance Revisions Preliminary draft complete and submitted to City Manager/staff for review. Submitted work order form to City for authorization of this project for our records. 1.3. Postal Facility Received change order mid-April. Hope to have agreement between City/Minyar~s in May/June, 1988 to present to council. P & Z Working with staff on as-needed basis. Current projects are: Northlake Industrial Tract, Riverchase Clubhouse Addition, Gateway Park at Coppel!, Valley Ranch Plaza (Pad A - Exxon), Meadows (Section 6), Fairway Drive, Century Park (Magnolia), Exxon (saNdy Lake Crossing), Channel Pointe. 15. MacArthur Blvd./Sandy Lake Intersection 16. No change in status. Provided cost estimat~ at February 9, 1988 CoUncilmeet~ng for temporary Signals (ie., poles and span wires permanent mast arms). currently awaiting city's authorization to proceed with design, bid and construction. Sandy Lak~ Rd,/Moore Rd. Intersection No change in status. Improvements needed to install loop detectors and protected !eft-turn at this intersection per City's request. Prepared cost estimate and presented at February 9, 1988 Council meeting. Plan is to include in bid package with sandy Lake/MacArthUr signals. Will proceed with design, bid and construction upon City's authorization of project. 17. Old Elevated Water Storaae Tank No further action requested of Ginn, City staff pursuing bids. 18. DeForest Road Pavina Improvements 19. Inc, at this time. No change in status. Cost presented at February 9, 1988 CoUncil meeting. Currently awaiting City's authorization to proceed with this project. Floodplain Administrator Working with City on as-needed basis. 20. Johnny Thompson Tract'iAccess to TRA Svstem 21. 2 2 · Completed. Thompson's content. Larry Jackson currently reviewing Johnny "hold harmless" instrument for proper form and WhisDer~og ~ill Drainaoe Study No change in status. cost presented to Council February 9, 1988. Currently awaiting City's authorization to proceed. ~ppin~ Same status as above. 23. Parkway Boulevard Pavina same status as above. $~uel Boulevard Pavina Same status as above. Thank you for the opportunity to work with the City of Coppell on these and future projects. /dsp