ST9304-CS 880510t? ~.l~, 1988
Alan D. R~tliff, City Manager
City of Coppell
Report
monthly report reflects the current status of each
rn~'~rent active projects that we are working on for the
c~,ppe]l~ we have prepared the info,etlon in'e~eoutive
fo~- your convenience. We will be happy to' expand o~
~nfor"m~-~uion p'uovided for any ParticUlar Projebt shoutd~ You so
South)
Consu:,'.'uction began March 2, 1987.
~cr. co'repletion date August 22, 1988.
April 30, 1988: 63% work- completed, versus 78%
cont'r-act time.
,~.;~t-;ed contract amount to date (with Change Orders)
864.91 .
..,'~tor currently completely sto~ sewer. Phase III
of Cwo northbound lanes (Sanders' ~op northward)
~ed. cowboy Drive intersection paving c'ompl'eted;
D~ive intersection shall be re-opened to traffic MaY
· t.- ,. _..~'j.q'.hX.,~q'[_~ Road
. :,::, ,... cic:i:.i c, n began September 1, 1987.
-.~" ...... ~-L ¢o'mpleti~n date June 26, 1988.
· ,. ~,3~..~.~1 c~mbract: amount $618,526.94.
..... ~.,,. Ap~'.[t 30, 1988: 89% work completed versus 80%
~'avi. n~3 on south half of roadway is completed, contractor
curra,~tly performing clean-up, backfilling parkways, eLc.
open ko two-way traffic approx. May 27, 1988.
Sum; I00 · I.B 118 ~ l)alias, Texas 75248 · Pho.u 214/248-4900
contracts £or both segments awarded April 26, 198'8 to~LiH~
Lacy Co. (total amount $5,191,943.03).
B~lt Line to Sandy Lake segment - estimated construction
start June, 1988; complete June, 1989 (Contract amount
$3,388,580,00).
Sandy Lake to Denton Creek segment - estimated constz~ction
start June, 1988; complete June, 1989 (Contract amount
$1,803,363.03).
Total project cost including traffic signals, street lights,
landscaping, and RxR crossing etc. is approximatel~
$7,200,000.00.
Agreements still pending with Conoco, Explorer, and St.
T~uis Southwestern Railroad.
Re-design of paving and drainage -
MacArthur to West' overflow swale is 40% Complete. ',- '~
Dallas County would like to bid this portion of Belt Line
Road with Carrollton's portion.
Due to R.O.W. problems R x R, the county is currently re-
designing the Carrollton portion of the project.
Anticipated completion date for the re-design and subsequent
bidding and construction is unknown at this time.
Belt Line (E-W) relocation west of MacArthur - Awaiting
final execution of City/Developer agreement.
PROJECTS
:~. 24". cross-towD Woter Line
Design 82% complete.
Anticipate completion of design end of June,_ 1988.
Design in progress for segment along MacArthUr and Sandy
Lake 'to new pump station site.
Still awaiting City of Dallas design and route approval.
Estimated construction cost $1,500,000.00.
~. ~rou~d Storage T~nk
Design 85% complete.
Anticipate bidding in late May 1988.
Pt_imp ~t ~atio~l
Design 25% complete.
~'4J. ll present revised bid and construction schedules .after
· ~ank is bid.
~,~ISCELL~NEOU8 PROJECT8
Meadowrid~e Drainage Problem
No change in status since .last report.
Belt Line Traffic Signals
Design and specs, completed.
Bid: June 2, 1988.
Scope: Permanent signals for Cowboy/Belt
Tap/Southwestern/Belt Line intersections.
Estimated construction cost $175,000.00.
10. ~i~hway 121 By-Pass
Line and
11.
No activity this period.
Cotton Road Name Chanae
No luther participation by Ginn, Inc. on:this project
requested.
City Attorney pursuing annexing south half of R.O.W~ at this
time.
Name change to be pursued by City staff thereafter for the
east/west segment, west of IH635.
12. sub~Division Ordinance Revisions
Preliminary draft complete and submitted to City
Manager/staff for review.
Submitted work order form to City for authorization of this
project for our records.
1.3. Postal Facility
Received change order mid-April.
Hope to have agreement between City/Minyar~s in May/June,
1988 to present to council.
P & Z
Working with staff on as-needed basis.
Current projects are: Northlake Industrial Tract,
Riverchase Clubhouse Addition, Gateway Park at Coppel!,
Valley Ranch Plaza (Pad A - Exxon), Meadows (Section 6),
Fairway Drive, Century Park (Magnolia), Exxon (saNdy Lake
Crossing), Channel Pointe.
15. MacArthur Blvd./Sandy Lake Intersection
16.
No change in status.
Provided cost estimat~ at February 9, 1988 CoUncilmeet~ng
for temporary Signals (ie., poles and span wires
permanent mast arms).
currently awaiting city's authorization to proceed with
design, bid and construction.
Sandy Lak~ Rd,/Moore Rd. Intersection
No change in status.
Improvements needed to install loop detectors and protected
!eft-turn at this intersection per City's request.
Prepared cost estimate and presented at February 9, 1988
Council meeting.
Plan is to include in bid package with sandy Lake/MacArthUr
signals. Will proceed with design, bid and construction
upon City's authorization of project.
17. Old Elevated Water Storaae Tank
No further action requested of Ginn,
City staff pursuing bids.
18. DeForest Road Pavina Improvements
19.
Inc,
at this time.
No change in status.
Cost presented at February 9, 1988 CoUncil meeting.
Currently awaiting City's authorization to proceed with this
project.
Floodplain Administrator
Working with City on as-needed basis.
20. Johnny Thompson Tract'iAccess to TRA Svstem
21.
2 2 ·
Completed.
Thompson's
content.
Larry Jackson currently reviewing Johnny
"hold harmless" instrument for proper form and
WhisDer~og ~ill Drainaoe Study
No change in status.
cost presented to Council February 9, 1988.
Currently awaiting City's authorization to proceed.
~ppin~
Same status as above.
23.
Parkway Boulevard Pavina
same status as above.
$~uel Boulevard Pavina
Same status as above.
Thank you for the opportunity to work with the City of Coppell on
these and future projects.