Loading...
ST9304-CS 880321P.O Box 478 Coppell. Texas 75019 214- 462- 0022 March 21, 1988 George Schrader Schrader & Black Associates 2001 Bryan Tower, Suite 3910 Dallas, TX 75201 Dear George: Based on our review of County funds which we thought would be available for the improvements to Beltline East/West, we are advised that all County funds allocated for the Coppell section will be required to construct the bridge over the river at the East City limits. It will, therefore, require developers to supply all funds for the remainder of the project or we must wait until the city can consider a new bond issue. The earliest we would anticipate this is after 1990. It is imperative that you secure funding from the City of Dallas and Dallas County as an adjoining property owner to pave that section of Beltline which is in the City of Dallas. Sincerely, Alan D. Ratliff/- City Manager city of Coppell ADR/dgc cc: Mayor and City Council Wayne Ginn, City Engineer BELTLINE.LTR FORWARDED TO