Loading...
ST8505-CS 890719GINN, INC. CONSULTING ENGINEERS July 19, 1989 Mr. J.M. Albert, President Ed Bell Construction Co., Inc. P.O. Box 540787 Dallas, TX 75354-0787 Re: Belt Line Road Improvements Median Irrigation System (Sout Dear Mr. Albert: We have received and reviewed your June 29, 1989 letter regarding the reduction in scope of the median irrigation system installation. The unit prices in your letter do not agree with those included in the cost breakdown of your November 23, 1988 letter. Please revise and resubmit your proposed credit for this work using the unit prices of your November 23,1988 letter and a proration of the original mobilization amount to reflect the reduced scope of work. If you wish to discuss this prior to resubmitting your proposal, please call me. Sincerely, John C. Karlsruher, P.E. Senior Engineer JCK/dsp cc:~.E. H. Wayne Ginn, P.E. Randy Fleming File 255 17103 Prcston Road ® Suite 100 · LB !18 · Dalla% Texas 75248 · Phone 214/248-4900