ST8505-CS 890719GINN, INC.
CONSULTING ENGINEERS
July 19, 1989
Mr. J.M. Albert, President
Ed Bell Construction Co., Inc.
P.O. Box 540787
Dallas, TX 75354-0787
Re: Belt Line Road Improvements
Median Irrigation System
(Sout
Dear Mr. Albert:
We have received and reviewed your June 29, 1989 letter regarding
the reduction in scope of the median irrigation system
installation. The unit prices in your letter do not agree with
those included in the cost breakdown of your November 23, 1988
letter. Please revise and resubmit your proposed credit for this
work using the unit prices of your November 23,1988 letter and a
proration of the original mobilization amount to reflect the
reduced scope of work.
If you wish to discuss this prior to resubmitting your proposal,
please call me.
Sincerely,
John C. Karlsruher, P.E.
Senior Engineer
JCK/dsp
cc:~.E.
H. Wayne Ginn, P.E.
Randy Fleming
File 255
17103 Prcston Road ® Suite 100 · LB !18 · Dalla% Texas 75248 · Phone 214/248-4900