ST8505-CS 890620GINN, INC. CONSULTING ENGINEERS June 20, 1989 / Mr. Mike AlbUm, President Ed Bell Co~truction Co. P.O. Box/540787 Dalla~fl/~X 75354-0787 Re: 'Belt Line Road (South) Pavement and Storm Sewer Lateral Repairs Adjacent to the North Lake Park Property Dear Mike: Enclosed for your records is a copy of the revised recommendations of our testing lab regarding the above referenced subject. Please correct these areas in accordance with the lab's recommendations and schedule the testing lab accordingly. Please indicate in writing which concrete mix design and borrow source you propose to use for this work if they differ from the original shop drawings approved for this project: 1) Gifford Hill mix design (6 sack) for hand pours; 2) Belt Line Road (East) borrow source. On another issue, we are prepared at this time to begin review of your contract closeout submittals immediately upon receipt. Please call if you have any questions regarding this. PoE0 KP/dsp X _ cc: Russel~le, P.E. Steve.~am H. Wayne Ginn, P.E. Randy Fleming File 255 17103 Preston Road ® Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/2484900 Consulting Engineers · Ge·technical · Environmental · Construction Materials Testing DALLAS · FORT V~ORTH · HOUSTON · AUSTIN Ginn, Inc. Consulting Engineer{ 17103 Preston Road Suite 100 Dallas, Texas 75248 June 12, 1989 Project No. DE89-047 Attn: Mr. Kevin E. Peiffer, P.E. Re: Repairs to Storm Sewer Laterals and Pavements Beltline Road Coppell, Texas Gentlemen: This letter is to confirm our conversation in the meeting of June 9, 1989 regarding the above referenced project. Results of field density tests performed on May 25, 1989 at this site, as well as the observations of a TERRA-MAR geotechnical engineer, indicate backfill and storm sewer laterals generally exhibit high soil 'moisture content and densities which are relatively low. In addition,' areas of the natural subgrade have similar moisture contents with some densities less than what would be specified for recompacted soils. It is our recommendation that backfill in storm sewer lateral trenches which is not in compliance with pro3ect compaction specifications be removed to the top of the sand cement in the trench. Backfill should be replaced so that' compaction is within specified ranges for moisture content and density. Based on the fact that the cement modified soil subgrade is intact and that test results and visual observations indicate natural soils to be compact, it is our opinion that replacement of the natural soils outside the trenches is not warranted. Given the 9 inches of Portland Cement concrete, the 12 inches of cement modified subgrade, and subgrade condition as indicated by test results and observations, it is also our opinion the pavement structure is adequate and should perform as designed. However~ it 'should be recognized that there remains a risk of distress resulting from subgrade movement for any pavement constructed on expansive subgrade soils. 2679 Lombardy, Dallas, Texas 75220 Phone: 214-352-8352 Repairs should include replacement of lateral line backfill at the specified moisture content and density. Onsite soils or off-site soils free of organics or debris and with similar properties should be utilized as backfill. It is recommended that excavation of trench backfill extend about one foot (transversely) outside the trench limits. This would aid in sealing the trench against future surface water infiltration. Where cement modified subgrade has been removed it should be replaced with sand cement, cement treated base, or a similar material to grade of the remainder of the treated subgrade. Any cracks or open joints in the cement modified subgrade should be sealed with asphaltic cement joint compound prior to replacing the pavement section. Excavations for test pits should be repaired in a similar manner. We appreciate the opportunity to be of service. If we may be of further assistance please do not hesitate to call. Sincerely, TERRA-MAR, INC. Mark E. Wyatt, E.I.T. Staff Engineer Berry R. Grubbs, P.E. Principal Engineer MEW/BRG/sb Project No. DE89-047 2