Loading...
2001_0508 WATER Issued: Finished: "5 `(3 - D Employee /�;:z� L Grid map: I Name: Address: '7c. `l i+ ) 1-C? V C( Phone Number: (I (WK): Check for: Accuracy test: Meter Leak: Check water pressure: Initial meter relocation inspections Re -read 1. Backflow Insp. 2. Repair 3. Maintenance 4. Other Backflow [nsp. A. Main Line A. Pump A. Line Locate Bktlow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D Excavation E. Safety 5. Reason for failure: A. Electrolysis B. New Construction C Poor Installation D. Other 6. List of safety equipment at site if applicable: A. Barricades B. Cones C. Tape D. Lights E. Other Request for Services: 7< j 1 'S h c-e. n'1 £ f�C e i� gi_ro 7. If MeteriService Leak: Classify: - City: Customer A. Water Loss (estimate): GPM Fire plug flushing Total Gallons B. Was Water "Metered: Yes No C. Was Customer Notified: Verbally Doorknocker - Vehicle/Equipment used 8. If Meter Change Out: Unit # Miles Hrs Equipment A. Old Meter 4 1.5 ( Reading G r5 B. New Meter 2 lG y� J � � Reading / C. Old Meter Size.Type: 1r to 1 at. D New Meter SizefType 3 /( 014-141--qtr E. Type of work performed or findings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: :0. Man- hc:s: ! U •` ) Crew Members. ti, / ( 11. List Materials Used: 12. If you had an accident incident while performing this request. Did you report it? Yes or no 13. Water Utilities meter inspection: as or fail • 14. How many trips to do task? Signature i r r %�;