ST8505-CS 890523GINN, INC.
CONSULTING ENGINEERS
May 23, 1989
Mr. Frank Trio
City of Co,ell
P.O. Box ~q8
Co .ppe~/TX. 75019
Re. ~elt Line Road Improvements
Application for Payment No. 24
Dear Mr. Trando:
Enclosed are three (3) copies of Application for Payment No. 24
in the amount of $72,199.69 from Ed Bell Construction Co.
representing work performed on the above referenced project
through April 30, 1989.
While reviewing this pay application, a subtraction error was
discovered on page 10, thereby changing the total amount due to
$71,899.69. We recommend that payment in full for $71,899.69 be
made at this time.
Sincerely,
H. Wayne Ginn, P.E.
KEP/HWG/dsp
enclosure: (3) Pay Applications
cc:
Ed Bell Construction Co. w/enclosure
Alan Ratliff
Russell Doyle~,~
Dorothy Timmons
Randy Fleming w/enclosure
File 255 w/enclosure
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900