Please be advised that after considerable delay beyond the City
of Coppell's control, that the 48 oak hardwood trees required by
the Corps of Engineers on the above referenced project have been
installed. These trees were required by the Corps of Engineers
as a result of filling in approximately 1.25 acres of North Lake
with rock fill to accommodate this road widening project.
Per the attached as-built map of the tree planting location, the
original tree location proposed was not a viable alternative for
the City of Coppell after pursuing this site with T.U. Electric.
Rather, T.U. Electric selected the actual site shown feeling that
this location will cause the least amount of interference for the
Irving Parks Department regarding their park master plan that is
currently in the design phase for North Lake Park.
The purpose of this correspondence is to bring to the City's
attention that some type of coordination for maintenance of the
trees needs to be worked out for watering these trees on the
Irving Park property.
For your information, this park is in the Dallas City limits.
Dallas Parks and Recreation leases the park from T.U. Electric
who in turn has sub-leased the park to the Irving Parks
Department. The City of Irving now controls the entrance to the
property.
Per the Corps of Engineers' permit (copy attached), the City of
Coppell must maintain at least a 90 percent survival rate for two
years from the date of planting which was May 15, 1989.
The elevation of the area where the trees are planted should be
at elevation 512.00 NGVD, as required.
17103 Preston Road · Suite I00 · LB 118 · Dallas, Texas 75248 · Phone214/2484900
Ed Bell Construction Company is required, per their contract with
the City of Coppell, to provide maintenance to these trees until
final acceptance of the project. After that time, normal
maintenance will be the responsibility of the City of Coppell
either directly or through other arrangements that may be made.
By copy of this letter we request the Corps of Engineers to
accept this letter, submitted on behalf of the City of Coppell,
as formal notification of the completed planting as required per
special condition "C" of the attached permit.
Please call if you have any questions.
Sincere ly, /7
Kevin E. Peif~er, P.E.
Project Engineer
KP/dsp
cc:
Jim Townsend - Corps of Engrs.
Mike Albert - Ed Bell Const.
Steve Goram
Richard Diano
Randy Fleming
File 255