SS9301-CS 921116 THE GINN CORPORATION Consulting Engineers November 16, 1992 Ken Griffin, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 RE: C.O. #1 & #2 Grapevine Creek Sewer Dear Ken: Attached are draft copies of C.O.#1 and C.O.#2 as discussed. We elected to make C.O.#1 the cost for microtunneling Fast Bethel and C.O.#2 the cost for Lateral "A" across Ms. Alexandra' s property. The Plans have been revised for C.O.#2 and are transmitted separately. We have elected not to revise the drawings for C.O.#1 until after Council approval. If you have any questions, please call. Yours truly, . ay eGinn, P.E. HWG:sb Enclosure cc: Steve Goram File 17103 Preston Road · Suite 205 · Dallas, Texas 75248 · Phone 214/248-4900 P.O. Box 796577 · Dallas, Texas 75379-6577 · FAX 214/931-1452 CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Grapevine Creek Sewer Branch I CONTRACTOR: KEN'KO, Inc. OWNER: City of Coppell CHANGE ORDER NO: 1 DATE: 11/16/92 CHANGE OR EXTRA WORK TO BE DONE Description: Microtunnel East Bethel Road Exhibit "A" - Letter dated Oct. 14, 1992 attached hereto (4 pages) Previous contract amount ............................................................. $2,561,212.50 Net increase (decrease) in contract amount ........................................... 210,876.00 Revised contract amount ................................................................ 2,772,088.50 Net increase (decrease) in contract time of completion .................................... -0- Revised contract time of completion ......................................................... N/A The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. Recommended by the City Engineer: Date: Agreed to by the Contractor: Date: Accepted by the Owner: Date: DRAFT CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: Grapevine Creek Sewer Branch H CONTRACTOR: KENKO, Inc. OWNER: City of Coppell CHANGE ORDER NO: 2 DATE: 11/16/92 CHANGE OR EXTRA WORK TO BE DONE Description: Add Lateral ~A" Exhibit "B" attached hereto (1 page) Previous contract amount ............................................................. $2,772,088.50 Net increase (decrease) in contract amount ............................................. 42,917.00 Revised contract amount ................................................................ 2,815,005.50 Net increase (decrease) in contract time of completion .................................... -0- Revised contract time of completion ......................................................... N/A The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract. Recommended by the City Engineer: Date: Agreed to by theContractor: Date: Accepted by theOwner: Date: DRAFT CITY OF COPPELL GRAPEVINE CREEK SEWER BRANCH II C.O.//2 LATERAL "A" 11/13/92 Approx. Unit Item Item # Description Oty. Price Tolal 2050-1 Abandon exist. MH 1 ea. @ $100 -- $100.00 2600-3 Std. 5' MH (10'-15') 1 ea. @ $2,700 --- 2,700.00 2600-5 Std. 6' MH 05'-20') 1 ea. @ 3,600 = 3,600.00 2600-7 5' Drop MH (15'-20') 1 ea. @ 2,900 = 2,900.00 2610-2 24" PVC Sewer (10'-15') 308 LF @ 74.00 =22,792.00 2610-3 24" PVC Sewer (15'-20') 75 LF @ 78.00 = 5,850.00 2610-4 24" PVC Sewer (20'-25') 25 LF @ 89.00 --- 2,225.00 2610-11 Vents for MH's 2 ea. @ 500 -- 1,000.00 2610-9 12" PVC Sewer 10 LF @ 40 = 400.00 2610-8 15" PVC Sewer 30 LF @ 45 = 1.350.00 TOTAL $42.917.00 DRAFT EXHIBIT "B" THE GINN CORPORATION CONSULTUNG ENGINEERS FACSIMILE COVER SHEET TO: ADDRESS: PIIONE: FROM: ~' SUITE 205, LOCK BOX 118 DALLAS, TEXAS 75248 (214)248-4900 (214)931-14~2 (FAX) ~BER OF PAG~ (~CLUDING COVER SI-IEEe: ~ COMMENTS: "':~:~-~..~. : __ 5~o DalIas Area Rapid Transit (~._C. ~  PC Box 66C163 ~ Dallas, Texas 75266-C163 ..... 214/748-3278 0~ ~ November 16, 1992 Mr. Ken Griffin, P.E. City of Coppell . P. O. Box 478 Coppell, TX 75019 Re: License Agreement covering a 24-inch sanitary sewer main crossing at Mile Post 606.84 in Coppell Dear Mr. Griffin: In August at the request of the City's attorney, Mr. Lawrence W. Jackson, a revised license as referenced above was submitted for City review and approval. Please advise if the Grapevine Creek Sanitary Sewer Trunk Main, Branch I and II plans include a crossing of the former Sto Louis Southwestern Railway right of way as originally proposed by the City's engineering firm, Ginn, Inc. Your advise on the status of this project would be appreciated. Both the license agreement and the Construction Agreement and Contractor's Right of Entry must be completed prior to construction with DART right of way° If I can be of any assistance to City staff or the City's contractor, please contact me at 749-2917. Sincerely, Jan Seidner R/W Management Representative JMS: