Loading...
SS9301-CS 921008 TIa z GINN CORPORATIL N Cons#lting Engineer~ October 8, 1992 Mr. Dan Frettinger Kenko Contractors, Inc. 16415 Addison Road, Suite 308 Addison, Texas 75248-2462 RE: City of Coppell Grapevine Creek Sewer Dear Dan: As a follow up to our meeting on Friday, October 2, 1992 regarding the above referenced project, we would like to investigate the possibility of Microtunnelling Bethel Road as an alternate to the cut, fill, and repave method that was bid. Attached is a Preliminary Cost Comparison Form listing the deletions and additions for the Microtunnelling alternative. These plan quantities are estimated from sheets 5 through 9 of the construction plans. Please give us your analysis of this proposed alternative and the additional cost to the City. We would like to resolve this issue prior to making an Engineering recommendation to the City. Please advise at your earliest convenience. Yours trul/.y:/~ H. Wayfie Ginn, P.E. HWG: sb ~ Enclosure cc: Ken Griffin Steve Goram File D:~W1NWO RDM3 IN N_~'~C~CLIENT$~,COPPELL~K ENKOLT R .DOC 17103 Preston Road · Suite 205 · Dallas, Texas 75248 · Phone 214/248-4900 P.O. Box 796577 · Dallas, Texas 75379-6577 · FAX 214/931-1452 CITY OF COPPELL PRELIMINARY COST COMPARISON FOR MICRO TUNNELLING BETHEL ROAD PLAN SHEET #5 DELETE ITEM # UNIT PRICE 2610-3 30" PVC 260 LF 2610-2 30" PVC 70 LF 475 ALL 2530 BRICK PAVERS 2600-3 MH @ 120.4.80 2600-2 MH @ 119.4.70 SUBTOTAL $( ) ADD ITEM # UNIT PRICE MICROTUNNELL 335 LF DROP MH @ 119.4.70 (40 x 20) PVMNT REPAIR 2 LS SUBTOTAL $ PLAN SHEET #6 DELETE ITEM # UNIT PRICE 2610-2 30" PVC 200 LF 2610-3 30" PVC 350 LF 2600-12 MH@ 118 -4- 00 2600-3 MH@ 115.4.65 2600-3 MH@ 114.4.45 SUBTOTAL $( ) ADD ITEM # UNIT PRICE MICROTUNNELL 550 LF DROP MH @ 118 +00 MH (28'-30') @ 114.4,45 (40x20) PVMT REPAIR 2 LS SUBTOTAL $ PAGE 1 OF 3 PLAN SHEET//7 DELETE ITEM # UNIT PRICE 2610-3 30" PVC 600 LF 2600-3 MH @ 113+25 MH @ 112+40 MH @ 108+90 MH @ 107+60 , SUBTOTAL $( ) ADD ITEM # UNIT PRICE MICROTUNNEL 600 LF MH @ 112+40 (25'-30') MH @ 108+90 (25'-30) (40x20) PVMNT REPAIR 2 LS SUBTOTAL $ PLAN SHEET #8 DELETE ITEM # UNIT PRICE 2610-3 30" PVC 630 LF 2600-3 MH 7 EA. SUBTOTAL $( ) ADD ITEM # UNIT PRICE MICROTUNNEL 630 LF MH @ 105+03 (25'-30') MH @ 102+48 (25'-30') (40 x 20) PVMNT REPAIR 2 LS SUBTOTAL $ PAGE 2 OF 3 PLAN SHEET//9 DELETE ITEM # UNIT PRICE 2610-2 30" PVC 130 LF SUBTOTAL $( ) ADD ITEM # UNIT PRICE MICROTUNNEL 130 LF (40 x 20) PVMNT REPAIR 1 LS SUBTOTAL $ TOTAL DIFFERENCE (PIPE INSTALLATION) $ SHEET 5 TO 9 DELETE PAVING SUBTOTAL $(122,864.00) TOTAL NET INCREASE $ PAGE 3 OF 3