Loading...
ST8505-CS 890422TO GINN, INC. Consulting Engineers 17103 Preston Road Suite 100, LB-118 DALLAS, TEXAS 75248 (214) 248-4900 WE ARE SENDING YOU /~ Attached [] Under separate cover via the following items: [] Shop drawings [] Prints [] Plans [] Samples [] Specifications [] Copy of letter [] Change order ~' z'~2~'~'~ /0 COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: [] For approval ~For your use [] As r~uested [] For review and comment [] FOR BIDS DUE REMARKS ; [] Approved as submitted [] Approved as noted [] Returned for corrections 19 [] Resubmit [] Submit [] Return__ copies for approval copies for distribution corrected prints __ [] PRINTS RETURNED AFTER LOAN TO US WORK DIRECTIVE CHANGE ~ (Instructions on revers~ side) No. Ten (10) PROJECT: Belt Line Road Improvements' DATE OF ISSUANCE: April .21,' 1989. [South) OWN ER: (Name. City of Coppell Address) 255 Parkway Blvd. C~"~" .~,Cbo. ppell, Texas 75019 u~,s~.~Jv~: Ed Bell Construction Company, Inc. OWNER's Project No. ENGINEER: (;inn Inc. (Kevin E. Peiffer', . P, E. ) CONTR~CT FOR: Belt Line Rd, Imprvts.ENGINEER's Project No, 2q5 You are directed to proceed promptly with the following change(s): Description: Painting of the decorative concrete railings on the' above referenced project. Material' to be' Thoro-Coat Product'(mfg, bM Thoro System Products), one coat, brushed, smooth finish,' white in color. Purpose of Work Directive Change: Provide aesthetically desired finish to the decorative concrete rails (istPier .City Councils d, sir~. . Attachments: documents supporfang change) Mfgs. application recon~nendations shall apply. Ifa claim is made that the above change(s) have affected Contract Price or Contract Time, any claim for a Change Order based thereon will involve one of the following methods of determining the effect of the change(s). Method of determining change in Contract Price: [] Time and materials [] Unit prices' ~ Cost plus fixed fee (LIg4P SLg0 [] Other Estimated increase ~) in Contract Price: $ 4.q3~-no If the change involves an increase, the esti- mated amount is not 1o be exceeded with- out further authorization. Method of determining change in Contract Time: [3 Contractor's records [3 Engineer's records ~ Other none Estimated increase (~) in Contract Time: none .... days. ff the change 'involves an increase, the estimated time is not to be exceeded withoul further autho- rization. - Kevxn' E. AUTHORIZE, D: EJ( DJ' ',~, 191o.,,.r .:9~3 }.d,t,,,n,