ST9304-CS 890405STATE OF TEXAS COUNTY OF DALLAS DRAFT PROPOSAL AGREEMENT CITY OF COPPELL AND CITY OF DALLAS COOPERATIVE IMPROVEMENT OF BELT LINE ROAD FROM DENTON TAP ROAD TO MACARTHUR BOULEVARD WHEREAS, the City of Coppell, Texas, hereinafter called "Coppell", and the city of Dallas, Texas, hereinafter called "Dallas", desire to enter into an agreement for the design, preparation for, acquisition of right-of-way, if needed, preparation of estimates of the cost of the project, preparation of estimates of assessments of adjoining benefiting property owners, and ultimately for construction of paving, (and) storm drainage improvements and installation of street lighting, traffic signalization, and regulatory signs, street signs, landscape and sprinkler systems, and street furniture in connection with the Belt Line Road Project from Denton Tap Road to MacArthur Boulevard, in the cities of Coppell and Dallas; and, Whereas, the Interlocal Cooperation Act, Article 4413 (32c) Vernon's Annotated Civil Statutes, provides authorization for any local government to contract with one or more local governments to perform governmental functions and services under the terms of the Act; and, Whereas, Coppell and Dallas wish to share all costs of planning the project including, but not limited to, surveying, engineering and design, preparation of mapping and other instruments for use in acquisition of right-of-way, if needed, and ultimately construction of paving and drainage facilities, installation of landscaping and sprinkler systems, installation of lighting, signing, signalization, appurtenances, inspection, materials testing, surveying, bid advertisement, and all other costs attached to the project; and, Whereas beneficiaries are the City of Coppell and owners of property in the corporate limits of Coppel% fronting on Belt Line Road and the City of Dallas and owners of property in the corporate limits of Dallas fronting on Belt Line Road; and, 4/5/89 Page 1 of 6 Whereas, sharing the cost of planning for and construction of these thoroughfare improvements in proportion to the incorporated area of each city fronting on Belt Line Road represents a fair division of cost of the project according to the benefits received; and, Whereas, 47% (11,470 feet) of the total 24,490 front feet fronting on the project is in the City of Coppell fronting on Belt Line Road and 53% (13,020 feet) of the 24,490 total front feet fronting on the project in the City of Dallas fronting on Belt Line Road (Exhibit 1); and, Whereas, a developer/property owner proposes to provide needed right-of-way (shown in Exhibit 1) and .to share in a portion of the cost of planning and design (Exhibit 3) and the cost of construction (Exhibit 2) as adjoining benefiting property owners; and, Whereas, the share of cost to be borne by the developer/property owner is to be credited to the city in which the property of the developer/property owner is located; Whereas, the city of Coppell and the city of Dallas egch desire to share in the fair division of cost of planning and'design of the Belt Line Road; and, Whereas, the fair division of design costs between the two cities and developer/property owners are shown in Exhibit 3; and, Whereas, the City of Coppell and the city of Dallas each desire to share in the fair division of construction costs of the Belt Line Road; and, Whereas, the fair division of construction costs (estimated) between the two cities and developer/property owner are shown in Exhibit 2; and, NOW, THEREFORE, THIS AGREEMENT is hereby made and entered into by Coppell and Dallas ..... for the mutual consideration stated herein: WITNESSETH PHASE I: Copp~ll hereby agrees to contract with Ginn, Inc. Consulting Engineers for surveying, preparation of maps for right-of-way alignment for the project, the preparation of engineering plans for required adjustment and/or relocation of all utilities, engineering design and preparation of constrUction plans and specification for paving and storm drainage improvements, estimates of cost, and estimates of assessments of adjoining benefiting property owners for the Belt Line Road Project. The'engineering contract with G~nn, Incorporated will provide for the work to be performed in three Parts. 4/5/89 Page 2 of 6 Part I: Preparation of a map establishing the right-of-way alignment for the project and indicating the requirement for acquisition for both permanent and temporary rights-of-way. Part II: The preparation of preliminary plans and outline specifications for construction, preparation of plans for adjustment and/or relocation of all utilities required to accommodate the project, development of estimates of cost of construction, and preparation of estimates of assessments of adjoining benefiting property owners for the project. Part III: Preparation of complete engineering construction plans and specifications for the; paving and storm drainage improvements. (Coppell will advertise for bids receive, open and tabulate them, and will determine a low responsive bidder for construction of the improvements. It will furnish Dallas a tabulation of bids indicating a low responsive bidder). The City of Dallas' share of the cost of professional services under this contract shall not exceed' $292,689.44 for completion of work in Part I, II and III a~ outlined herein (shown in Exhibit 3, Page 1). The donsulting engineering contract will be paid for by Coppell; Coppell will invoice Dallas on a monthly basis for the Dallas proportionate share of the cost of the total monthly contract payments. II. Coppell hereby agrees to provide: A map to Dallas establishing a right-of-way alignment for the project and indicating the requirement for acquisition of both permanent and temporary rights-of-way . Preliminary engineering plans and outline specifications, final engineering plans for adjustment and/or relocation of all utilities, preliminary cost estimates, and preliminary estimates of assessments of adjoining benefiting property owners for review and approval by the City of Dallas prior to authorizing preparation of final construction plans and specifications; and, Final construction plans and specifications, final cost estimates, and estimates of assessments of adjoining benefiting property owners to Dallas~for review and approval prior to advertising for bids and award of a contract for construction. 4/5/89 Page 3 of 6 Approval of plans, specifications (including utility relocation plans), estimates of cost, and estimates of assessments of adjoining benefiting property owners will complete planning of the project and Phase I. Work will proceed, and only proceed, upon agreement by both the city of Coppell and the City of Dallas and arrangement for needed financing by each respective city. III. Phase II. When the authorization to proceed with construction is provided by both the City of Dallas and the City of Coppell and certification of reservation of funding by both for their respective shares of the project cost has been provided, (Upon approval of plans and specifications by Dallas for its share of the project cost), Coppell will advertise for bids, receive, open, and tabulate them and will determine the low responsive bidder for construction of the improvements. It will furnish Dallas a tabulation of bids indicating the low responsive bidder. Coppell and Dallas agree to promptly initiate and complete lprocedures assessing a portion of the cost according to its own policies against adjoining benefiting owners of property within their respective jurisdiction. ~ Coppell will award the contract to the low responsive bidder. Coppell hereby agrees to establish and provide a right-of-way alignment for the Belt Line Road Project acceptable to Dallas. Coppell further agrees to provide field notes describing any needed temporary working right-of-way and additional permanent right-of-way required as defined by the approved right-of-way alignment and the approved construction plans. Coppell hereby agrees to acquire additional right-of-way in Dallas and Coppell, if any is needed, in accordance with the approved alignment and plans and as described by the field notes provided by Coppell. Said acquisition may include the use of eminent domain in accordance with the laws of the State of Texas. The cost of all right-of-way acquired and all costs related to the acquisition, including but not limited to appraisal fees, i?i~title~ fees, attorneys fees, court costs, and relocation '!~i!iassistance, shall be the responsibility of the city in which the iii!right-of-way is located. . ii!~Coppell will notify Dallas of acquisition and possession of ~.additional right-of-way. VI. Dallas hereby agrees to provide for the relocation and adjustment of utilities located in Dallas as required by the construction .... ~. 4/5/89 Page 4 of 6 !Coppell and Dallas hereby agree to provide the additional fun~ing necessary to complete the right-of-way acquisition, utility relocations and construction for these improvements, in accordance · with the proportional cost sharing basis agreed to above, at the earliest possible opportunity , or to mutuallysupport the pro~ect for funding through a program of a third agency such ~s the State Department of Highways and Public Transportation or the County of Dallas, should such program become available. ~Coppell hereby agrees ~!~adjustment of utilities construction. VII. to provide for the located in Coppell as VIII. relocation and required by the Coppell hereby agrees to provide for advertisement for bids and award of contract(s) for construction of the Belt Line Road Project and to provide for contract administration, construction inspection, and materials testing necessary to complete the construction in accordance with the approved plans and specifications, subject to the financing plan defined in Sections IX through X herein below. IX. ICoppell and Dallas hereby agree to bear costs of the improvements in proportion to the property within its corporate boundaries fronting on the project street (see Exhibits I and 2 attached). Coppell will invoice Dallas on a monthly basis f~r Dallas' proportional share of the total monthly construction contract costs and other incurred costs to be shared. Xe Coppell and Dallas hereby agree to provide for and share the actual construction costs for items required for traffic control, street lighting, street furniture when such items are included in the construction plans and contract by mutual agreement of Coppell and Dallas. Dallas further agrees to provide for the total actual construction cost for items required for utility relocation or adjustment, new sidewalks, new driveway approaches located in Dallas and included in the construction contract at the request of Dallas. XI. Coppell hereby agrees to provide iJconstruction costs for the project and X hereinabove. XlI. for its share of the total in accordance with Sections IX Coppell hereby agrees to advise Dallas of all design changes and construction change orders occurring during the construction and to include change orders requested by Dallas in the construction contract, subject to the approval of Coppell and Dallas. Funding for all change orders shall be in accordance with Sections IX and X hereinabove. 4/5/s9 Page 5 of 6 ~o~p,~,,.~..~e=~:~.~rees to credit Dallas for any decrease z~ = .... ~~'~4g" ~' ~, funded by Dallas in accordance with Section~ ~~~l~h~-'-above upon completion and final acceptance of the work and to return to Dallas all funds provided to Coppell '"~? '"' not required for construction under this AGREEMENT. Executed this the day of 1989, by the City of Coppell, pursuant to a resolution of its City Council adopted on , 1989 and by the City. of Dallas, pursuant to City Council Resolution No.. . / CITY OF COPPELL Alan D. Ratliff CITY OF DALLAS Richard Knight City Manager City Manager By: Assistant City Manager Approved as to Form: Lawrence Jackson City Attorney Approved as to Form: Analeslie Muncy City Attorney ATTEST: Assistant City Attorney ATTEST: City Secretary City Secretary enclosures: Exhibits 1, 2 and 3 4/5/89 Page 6 of 6 .' '// EXHIBIT 2 PROBABLE ESTIHATED CONSTRUCTION COSTS BELT LINE ROAD IMPROVEMENTS FROM DENTON TAP ROAD TO MACARTHUR BOULEVARD APRIL 5, 1989 IALLOCATION OF PROBABLE ESTIHATEO CONSTRUCTION COSTS ITEHIDESCRIPTIOH iCiTY OF COPPELLICITY OF DALLASI OEVELOPER I TOTAL A PAVI#G & DRAINAGE I $1,085,187.79 $2,875,7&7.64 ! $1,¢65.003.52 IS5,¢Z5,938.95 BRIDGE #X-1# TUEC RR X[NG I CREEK CHANNELZZATION I ELECTRIC LINE RELOCATIO# I HOCKINGBIRD LN. EXT INCL.:I TRAFFIC SIG.'S & 8RIDGE I HOORE ROAD TRAFFIC SlG#ALSJ I !STREET LIGNTI#G I HEOIAN LANDSCAPIXG $0.00 S47,000.00 SO.O0 S?00,000.00 $350o000.00 $0.00 S22,105.98 $52,000.00 I I so.oo I s89Z,ooo.ool I s53,000.00 I so.o0 I $0.00 I S300oO00.O0 I SO.O0 I $0.00 I $0.00 I S350,000.00 ! I $75,000.00 I SO.O0 I $58,580.86 I sz9,a~3.07 I S137,800.00 I S?O,~O0.O0 ! $89~,000.00 I S100,000.00 I I S300,O00.O0 I · I s?oo,ooo.oo I I STO0,O00.O0 ] I I S?5,000.O0 I ! S110,529.88 I I sz6o,ooo.oo I TOTAL I $2,256,Z93.?? 153,200,128.48 I $3,107,046.58 IS8,$63,46a.83 I PREPAREO BY GINI, INC. CONSULTING E#GINEERS PAGE I OF I EXHIBIT PROBABLE ESTIMATED ENGINEERING COSTS BELT LINE ROAD IMPROVEMENTS FROM DENTON TAP ROAD TO MACARTHUR BOULEVARD APRIL 5, 1989 IALLOCATION OF PROBASLE ESTIMATED COSTS OF IENGIHEERING SERVICES [TEMIDESCRIPTZOH ICITY OF COPPELLICITy OF OALLASl OEVELOPER I TOTAL 106 iDESXGN FEES a 85~ OF TOTAL IENGINEERING FEES: IA&B - PAVTNG, DRAINAGE & BRIDGE I"X - 1' IF - MOCKINGBIRD LN. EXT. [NCL: iPAVENG,DRAINAGE & BRIDGE IF&G - TRAFFIC SIGNALS AT #OORE& IMOC~iNGBIRD ID - GRAPEVINE CREEK RELOCATION IA~D CHANNELIZATIO# I[ ' MEDIAN LANDSCAPING I ! I S66,$91.08 I S176,466.35 I SZ~,304~O0 I $0.00 I SZ,BZ?.44 I S?,197.12 I so.oD I so.oo I S4,420.00 I $11,713.00 I I I S89,897~95 J S332,955.38 I SZZ,304.00 I S44,608.00 I S2,827.44 I S12,85Z.00 I s42,466:00 I s42,466.o0 $5,96?.00 ! $22,1oo.oo i STREET LIGHTING S563.?0 I S1,493.81 S761.00 I S2,818.5Z SUBTOTAL I S96;706.Z2 I S196,870.29 I S16~,223.39 I S45T,?99.90 260 IEASEMENTS,R.O.~. & ASSESSMENTS I 601 ISURVEYI#G (DESIGN ONLY) I 602 ITRAFFIC ENGINEERING I 604 IGEOTECHNZCAL ENGINEERING I 609 ITRENCK SAFETY (DES.&INSP.) I 610 IABSTRACT/TETLE I 650 IPRINTING I 651 ICOURIER & DELIVERY S20,O00.O0 S7,308.17 S200.O0 SS,000.O0 S3,00O.O0 S2OO.O0 SSO.O0 S53,000.00 I $27,000.00 I SlO0,O00.O0 I $19,366.65 J S9,866.03 I S36,540.8& i I S530.00 I $270.00 I $1,000.00 I I S13,250.00 [ S6,7S0.00 I S25,000.00 I I s7,95o.oo I ~,o5o.oo [ $15,000.00 I I $530.00 I S270.00 ! $1.o0o.oo I I $1.o~o.oo I $540.00 I s2,ooo.oo I i $132.50 I S67.50 I $250.00 IsuBToTAL I S36,158.17 I $95,819.15 I S48,813.53 ! Sl80,790.8~ ! I ................... ,', ......................................................................... ! PREPARED BY GINN, INC. CONSULTING ENGINEERS PAGE I O~ 2 ' EXHIBIT 3 PROBABLE ESTIHATED ENGINEERING COSTS BELT LINE ROAD IMPROVEMENTS FROM DENTON TAP ROAD TO MACARTHUR BOULEVARD APRIL 5, 1989 IALLOCATION OF PRONABLE ESTIHATED COSTS OF [ENGINEERING SERVICES ITE'IDESCRIPTION ICITY OF COPPELLICiTY OF DALLAS 107' ICONTRACT ADFIIN[STRATiO# Io 15~ OF TOTAL EHG. FEES: IA&8 - PAYING, DRAINAGE & BRIDGE S11,751.37 I'x - l- I I IF - HOC~:INGBIRD LN. EXT. INCL: S3,936.00 SO.O0 IPAV[NG,ORAINAGE & BRIDGE IF&G - TRAFFIC SZGHALS AT HOORE & S498.96 SI,2~0.08 I~IHGBIRD I = I ID - GRAPEVIHE CREE~ RELOCATION SO.O0 SO.O0 Ii - HEDIAN LANDSCAPING $~80.00 I I I IH - STREET LIGHTING ISUSTOTAL 108 INSPECTION & TESTING: IA&B - PAVING, DRAINAGE & BRIDGE I"x- I- IF - HOCICINGBIRD LN. EXT. INCL: IPAVING,DRAINAGE & BRIDGE IF&G - TRAFFIC SIGNALS AT #DORE &l IHOCKINGBIRD lo - GRAPEVINE CREE£ RELOCATION lAND CHANNELIZATION I! - HEDIAN LANDSCAPING I IH - STREET LIGHTING S89,082.94 S19,200.00 S1,782.00 $9,000.00 S0.00 SO.O0 I I I I S:OO,455.Z3 I so.oo I s189,538.17 I I I I so.oD I sO.OD I s19,ZOO.OO I I I I sz,z68.oo I sO.OD I s4,o5o.oo I I I I sO.OD I so.oo I sg, ooo.oo I I I I so.oD I so.oD I so.oD I I I I so.oD I sO.OD I sO.OD I ISUBTOTAL ! $119,064.94 I S102,723.23 I $o.oo I S221,788.17 I ITOTAL ENGINEERING I s268,995.13 I s430,15&.48 I $242,017.52 I S941,167.12 I PREPARED 8Y GINN, INC. CONSULTING ENGINEERS PAGE 2 OF 2"