Loading...
ST9304-CS 890331COPPELL PUBLIC WORKS ~arch 31, 1989 TO: FROM: RE: Steve Goram, Director of Public Works Howard Pafford, Water Utilities Foreman~ Preconstruction Meeting for Beltline Rd. East Paving Project Follow-up (Tickler 3/30/89) On Wednesday, March 29, myself and Per Birdsall attended the above mentioned preconstruction meeting. Bud Bean (Project Engineer for Dallas County) opened the meeting by calling for utility companies to address comments they had about removal and relocation of conflicting utility lines (gas, electric, telepone and petroleum pipe line). Then Mr. Bean asked that the Railroad Representative discuss the matter of raising their tracks to meet the grade of the proposed paving. After discussing the issue of the grade change of the railroad, Mr. Bean asked for comments from the cities that were involved in the project. At that time, Wade Mauldin (City of Carrollton Traffic Control Representative) commented on plans for controlling traffic during the portions of the project which were to take place within the City of Carrollton's city limits. When Mr. Mauldin had completed his comments, I spoke with Mr. Bean and Ron Moller (Austin paving Co.) about my concerns as to the time frame in which their project would begin in the area in which the 12" sanitary sewer line was to be abandon by the contractor for the constructioh of the Valley Ranch Center. Mr. Bean informed me that the start date £or grading in that portion of the project was to be sometime in May 1989. I informed him that the Valley Ranch people would need to schedule their construction according to the Beltline Rd. Improvements project's scheduling. Mr. Bean then asked for comments from Austin Paving concerning proposed start dates for each phase of the project. It was then determined that the initial start of the project would be at the Hutton Rd. intersection. There was a few comments from Dallas County Road and Bridge representativbes about grading plans and also comments from Construction, which will structures. the representatives with be installing the drainage Coppell pipe and The meeting was then adjourned. If you have any questions regarding my comments, please advise. ltLP/bb cc: Per Birdsall Attachment COMPANY _ PHONE NUMBER (e/~) - ' 46G - DAT~: .... NAM~ PHONE NUMBER ,,, . ~~//, ,. j,-