Loading...
ST9304-CS 890228February 28, 1989 The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 Mr. Johnny Thompson P. O. Box 1236 Coppell, Texas 75019 Dear Mr. Thompson: This is in response to your letter of February 17, 1989 (copy attached), requesting a left hand turning lane be constructed when the Belt Line Road improvements are made changing the current two lane asphalt pavement roadway to a six lane concrete pavement thoroughfare. You indicated this request is made because you want the traffic coming out of your driveway (across from Ledbetter Road) to be able to turn left and travel east, and to allow eastbound traffic to turn left into your driveway and not have to make a "U" turn to the east of your driveway to get there. There appears to be some confusion because there is a median cut designed for your driveway so that traffic can make the maneuvers you request in your letter. What apparently City staff, county staff and Ginn's personnel understood you to be asking for, is a left hand "turn-out" lane where vehicles can stack up getting out of the way of traffic coming behind them before they make their turn into your driveway. Attached is a copy of that section of the paving sheets for the Belt Line Road Construction Drawings showing the area of your driveway and the Ledbetter Road intersection. If you are interested in a left hand turn out lane, you will need to do the following: Provide Russell Doyle, City Engineer, the traffic counts and recommendation by a licensed Traffic Engineer that a left turn out lane is warranted and/or acceptable at the site considering the special conditions that exist. That is, it is not a typical at grade drive and the design engineers have not included such a lane in the design of this facility. Once you have submitted this information and it is reviewed and accepted, then in a return letter you will be asked to provide the costs for the construction of the requested left turnout lane. Once that commitment is made we will request for you the County to design that lane and install it. The county will then provide the actual costs of the design and construction of that lane and after you provide the funds for those improvements, they will be made. This procedure is described to you assuming that no complications or special conditions exist which will prevent the executing of any part of this request. We appreciate your concern about future traffic patterns in and out of your driveway on this new roadway, but hope that this information will rid you of your concerns expressed in the attached letter. Please provide the City Engineer with a copy of the document that provides your access to and from Belt Line Road across the railroad right-of-way. If you need any other information please feel free to contact the appropriate City staff or myself. Thank you. Sincerely, Alan D. Ratliff City Manager ADR/RRD/lsg/kg xc: Russell R. Doyle, City Engineer Bud Beene, Public Works Department, Dallas County Wayne Ginn, Ginn Inc. Shohre Daneshmand, Civil Engineer Dale Jackson, Building Official THOMP ~8 BO~ PoP. ~ °~ WALTER " ~ ~-~ ~ ~ MICKEY ~ = LINE EXPLORER PIPE 5/~ ~