Loading...
ST9505-LR 950720Hooper Engineering Laboratories, Construction Materials Testing Inc. REPORT OF CONCRETE TESTS JOB NO.: 95.1053 CLIENT: Prentiss Properties DATE: 20 July 1995 PROJECT: Executive Drive, Coppell, TX SUPPLIER: L.H. Lacy LOCATION OF POUR SET 3: Paving, southbound Executive Drive @ Station 8+30 LOCATION OF POUR SET 4: Paving, southbound Executive Drive (~ Station 8 +00 SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Cement Ticket No. Flyash Time Batched 11:50am 12:10pm Sand Time Sampled 11:55am 12:15pm in. Concrete Temp. {ASTM C1064l 91 °F 92°F 1.0 in. Air Content (ASTM C231) 5.5% 5.6% Water Unit Weight (ASTM C138! Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Number Inches Days Date {ASTM C1431 Total Load Compressive Required Pounds Strength 28-Day psi Strength 33 1.75 4 07/24/95 34 1.75 7 07/27/95 35 1.75 28 08/17~95 36 1.75 28 08/17/95 37 1.50 4 07/24/95 38 1.50 7 07/27/95 39 1.50 28 08/17/95 40 1.50 28 08/17/95 71,300 2520 86,300 3050 103,700 3670 102,600 3630 28-Day Average 3650 78,900 2790 82,400 2910 102,800 3640 101,900 3600 28-Day Average 3620 3600 3600 TECHNICIAN: DISTRIBUTION: GKO (11:00am-1:30pm) (1) Prentiss Properties, Tom Navin (1) L. H. Lacy Company (1) City of Coppell Engineering 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 95.1053 CLIENT: Prentiss Properties DATE: 20 July 1995 PROJECT: Executive Drive, Coppell, TX SUPPLIER: L.H. Lacy LOCATION OF POUR SET 3: Paving, southbound Executive Drive ~ Station 0 + 80 LOCATION OF POUR SET 4: SAMPLE DATA: SET 1 Truck No. Ticket No. Time Batched 3:15pm Time Sampled 3:20pm Concrete Temp. (ASTM C1064) 91 °F Air Content (ASTM C231) Unit Weight (ASTM C138l SET 2 MIX NO. Cement Flyash Sand ir]. 1.0 in. Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Number Inches Days Date {ASTM C1 Total Load Compressive Required Pounds Strength 28-Day psi Strength 41 1.00 4 07/24/95 42 1.00 7 07/27/95 43 1,00 7 07127/95 44 1.00 28 08/17/95 45 1.00 28 08/17/95 91,300 323O 103,800 367O 105,500 373O 124,900 4420 125,200 4430 2~-Oay Average 4420 3600 TECHNICIAN: DISTRIBUTION: LS (2:45pm-4:15pm) (1) Prentiss Properties, Tom Navin (1) L. H, Lacy Company (1) City of Coppell Engineering 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (2~[4) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 95.1'053 CLIENT: Prentiss Properties DATE: 20 July 1995 PROJECT: Executive Drive, Coppell, TX SUPPLIER: L.H. Lacy LOCATION OF POUR SET 3: Paving, Executive Drive north approach, east side LOCATION OF POUR SET 4: SAMPLE DATA: SET I SET 2 MIX NO. Truck No. 92-6 Cement Ticket No. Flyash Time Batched 7:30am Sand Time Sampled 7:40am in. Concrete Temp. (ASTM C1064) 98°F 1.0 in. Air Content (ASTM C231) 5.3% Water Unit Weight IASTM C138) 141.1 pcf Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Number Inches Days Date {ASTM C143) Total Load Compressive Required Pounds Strength 28-Day psi Strength 29 5.00 4 07/24/95 30 5.00 7 07/27/95 31 5.00 28 08/17/95 32 5.00 28 08/17/95 65,500 2320 75,80O 268O 101,900 3600 102,300 3620 28-Day Average 3610 3600 TECHNICIAN: DISTRIBUTION: MFM (7:00am-8:30am) (1) Prentiss Properties, Tom Navin (1) L. H. Lacy Company (1) City of Coppell Engineering 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 l--ax (214) 35~.-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 95.1053 CLIENT: Prentiss Properties DATE: 20 July 1995 PROJECT: Executive Drive, Coppell, TX SUPPLIER: L.H. Lacy LOCATION OF POUR SET 3: Paving, southbound Executive Drive ~ Station 8 +30 LOCATION OF POUR SET 4: Paving, southbound Executive Drive @ Station 8+00 SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Cement Ticket No. Flyash Time Batched 1 1:50am 12:10pm Sand Time Sampled 1 1:55am 12:1 5pm in. Concrete Temp. IASTM C1064l 91 °F 92°F 1.0 in. Air Content (ASTM C231) 5.5% 5.6% Water Unit Weight (ASTM C138) Admix # 1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Number Inches Days Date (ASTM Cl 43) Total Load ' Compressive Required Pounds Strength 28-Day psi Strength 33 1.75 4 07/24/95 34 1.75 7 07/27/95 35 1.75 28 08/17/95 36 1.75 28 08/17~95 37 1.50 4 07/24/95 38 1.50 7 07127195 39 1.50 28 08/17/95 40 1.50 28 08/17/95 71,300 2520 86,300 3050 28-Day Average 78,900 279O 82,400 2910 28-Day Average 3600 3600 TECHNICIAN: DISTRIBUTION: GKO (1 l:00am-l:30pm) (1! Prentiss Properties, Tom Navin (1) L. H. Lacy Company {1) City of Coppell Engineering 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 95.1053 CLIENT: Prentiss Properties DATE: 20 July 1995 PROJECT: Executive Drive, Coppell, TX SUPPLIER: L.H. Lacy LOCATION OF POUR SET 3: Paving, Executive Drive north approach, east side LOCATION OF POUR SET 4: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 92-6 Cement Ticket No. Flyash Time Batched 7:30am Sand Time Sampled 7:40am in. Concrete Temp. (ASTM C1064) 98°F 1.0 in. Air Content {ASTM C231) 5.3% Water Unit Weight {ASTM C138) 141.1 pcf Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39l (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Number Inches Days Date (ASTM C143) Total Load Compressive Required Pounds Strength 28-Day psi Strength 29 5.00 4 07/24/95 30 5.00 7 07/27/95 31 5.00 28 08/17/95 32 5.00 28 08/17/95 65,500 2320 75,800 2680 28-Day Average 3600 TECHNICIAN: DISTRIBUTION: MFM (7:00am-8:3Oam) (1) Prentiss Properties, Tom Navin (1) L. H. Lacy Company (1) City of Coppell Engineering 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 95.1053 CLIENT: Premiss Properties DATE: 20 July 1995 PROJECT: Executive Drive, Coppell, TX SUPPLIER: L.H. Lacy LOCATION OF POUR SET 3: Paving, southbound Executive Drive ~ Station 0+80 LOCATION OF POUR SET 4: SAMPLE DATA: SET 1 Truck No. Ticket No. Time Batched 3:15pm Time Sampled 3:20pm Concrete Temp. (ASTM C1064} 91 °F Air Content (ASTM C231) Unit Weight (ASTM C138) SET 2 MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) {Standard 6 inch x 12 inch cylinder) Cylinder Slump 'Age Test Number Inches Days Date {ASTM C1 Total Load Compressive Required Pounds Strength 28-Day psi Strength 41 1.00 4 07/24/95 42 1.00 7 07/27/95 43 1.00 7 07/27/95 44 1.00 28 08/17/95 45 1.00 28 08/17195 91,300 3230 103,800 367O 105,500 3730 28-Day Average 3600 TECHNICIAN: DISTRIBUTION: LS (2:45pm-4:15pm) {1 ) Prentiss Properties, Tom Navin (1) L. H. Lacy Company (1) City of Coppell Engineering 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148