Loading...
ST9505-LR 950714Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 95.1053 CLIENT: Prentiss Properties DATE: 14 July 1995 PROJECT: Executive Drive, Coppell, TX SUPPLIER: LOCATION OF POUR SET 3: Wall ~ Station 0 + 55 headwall, westbound pavement @ 425 Airline LOCATION OF POUR SET 4: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. (ASTM C1064) 1.0 in. Air Content (ASTM C231) Water Unit Weight {ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS {ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Number Inches Days Date (ASTM C143} Total Load Compressive Required Pounds Strength 28-Day psi Strength 54 13 07/27/95 55 13 07/27/95 56 28 08/11/95 57 28 08/11/95 144,300 5100 142,700 5050 155,100 5480 150,900 5340 28-Da¥ Average 5410 4200 NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Prentiss Properties, Tom Navin (1) North Texas Contracting (1) City of Coppell Engineering 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214.) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 95.1053 CLIENT: Prentiss Properties DATE: 14 July 1995 PROJECT: Executive Drive, Coppell, TX SUPPLIER: LOCATION OF POUR SET 3: Wall @ Station 0 + 55 headwall, westbound pavement ~ 425 Airline LOCATION OF POUR SET 4: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. (ASTM C1064} 1.0 in. Air Content {ASTM C231) Water Unit Weight [ASTM C138) Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39! (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Number Inches Days Date {ASTM C1431 Total Load Compressive Requi~ed Pounds Strength 28-Day psi Strength 54 13 07/27/95 55 13 07/27/95 56 28 08/11/95 57 28 08/11/95 144,300 5100 142,700 5050 28-Day Average 4200 NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Prentiss Properties, Tom Navin (1) North Texas Contracting (1) CiW of Coppell Engineering 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148