Loading...
ST9505-LR 950614Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Prentiss Properties PROJECT: Executive Drive, Coppell, TX LOCATION OF POUR SET 3: Junction box walls, Station 0+00 LOCATION OF POUR SET 4: JOB NO.: 95.1053 DATE: 14 June 1995 SUPPLIER: SAMPLE DATA: SET SET MIX NO. Truck No. Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. (ASTM C10641 1 .0 in. Air Content (ASTM C231) Wa[er Unit Weight ~ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Number Inches Days Date (ASTM C143) Total Load Compressive Required Pounds Strength 28-Day psi Strength 9 7 06/21/95 10 7 06/21/95 11 28 07/11 t95 1 2 28 07/11/95 93,900 3320 97,9OO 3460 28-Day Average 4200 NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Prentiss Properties, Tom Navin (1) North Texas Contracting (1) City of Coppell Engineering 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF ANALYSIS OF CONCRETE AGGREGATES CLIENT: L.H. Lacy Company DATE: 14 June 1995 PROJECT: Executive Drive, Coppell, TX JOB NO.: 95.1053 SAMPLES: Taken by a representative of Hooper Engineering Laboratories, Inc. on 6/7/95. SUPPLIER: Pioneer RETAINED ON SIEVE SIZE 1-1/2" 1" 3/4" 1/2" 3/8" No. 4 No. 8 No. 16 No. 30 No. 50 No. 1 O0 NATURAL SAND 0- #4 ASTM C33 REQUIREMENTS O% 0 2 0-5 10 0 - 20 22 15 - 50 40 40 - 75 82 70 - 90 97 90 - 98 FINENESS MODULUS SPECIFIC GRAVITY FINER THAN NO. 200 SIEVE DRY RODDED WEIGHT, PCF 2.53 2.60 TECHNICIAN: DISTRIBUTION: MAC/GKO/LS (1) Prentiss Properties, Tom Navin (1) L. H. Lacy Company (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, inc. Construction Materials Testing REPORT OF ANALYSIS OF CONCRETE AGGREGATES CLIENT: L.H. Lacy Company DATE: 14 June 1995 PROJECT: Executive Drive, Coppell, TX JOB NO.: 95.1053 SAMPLES: Taken by a representative of Hooper Engineering Laboratories, Inc. on 6/7/95. SUPPLIER: Pioneer RETAINED ON SIEVE SIZE CRUSHED STONE 1-1/2" - //4 ASTM C33, #467 REQUIREMENTS 1-1/2" 1" 3/4" 1/2" 3/8" No. 4 No. 8 No. 16 No. 30 No. 50 No. 100 0 21 49 8O 88 97 0-5 30-65 70-90 95-100 FINENESS MODULUS SPECIFIC GRAVITY FINER THAN NO. 200 SIEVE, % DRY RODDED WEIGHT, PCF 7.34 2.59 TECHNICIAN: DISTRIBUTION: MFM/MAC/GKO/LS (1) Prentiss Properties, Tom Navin (1) L. H. Lacy Company (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Prentiss Properties PROJECT: Executive Drive, Coppell, TX LOCATION OF POUR SET 3: Junction box walls, Station 0+00 LOCATION OF POUR SET 4: JOB NO.: DATE: SUPPLIER: 95.1053 14June 1995 SAMPLE DATA: SET SET MIX NO. Truck No. Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. [ASTM C1064) 1.0 in. Air Content (ASTM C231! Water Unit Weight (ASTM C138) Admix # 1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS {ASTM C39} (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Number Inches Days Date {ASTM C143) Total Load Compressive Required Pounds Strength 28-Day psi Strength 9 7 06/21/95 10 7 06/21/95 11 28 07/1 ?./95 12 28 07/lJ/95 93,900 3320 97,9OO 346O 119,200 4220 119,400 4220 28-Day Average 4220 4200 NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Prentiss Properties, Tom Navin (1) North Texas Contracting (1) City of Coppell Engineering 2870 Walnut Hill Lane Dallas, Texas 75229 (214).351-6419 Fax (214) 351-5148