Keith,
I have completed the preliminary cost for placing the low voltage lines (secondary and
service) underground. Please be aware that this is an estimate only, and could change
based on the individual locations. I have determined that the approximate cost to bury
under the road (using bores to avoid pavement cuts) would be $6500.00. This takes into
account 2 services currently overhead placed underground, remove all overhead
facilities, and boring the road to place cable underground to serve the 2 houses. If there
is only 1 house being served at a location, the price would drop a little by deleting the
nd
2 service and reducing the size of the cable being placed under the road.
Please make sure that the City understands that this is an estimate only (although it
should be pretty close) and if you decide to pursue this further, a field survey and actual
project would need to be produced to determine a fixed price.
I’m still working on the high voltage locations, but hope to have them by the end of the
week. Let me know if you need further explanation on this first price. Thanks!
Richard Brewster
Oncor Electric Delivery
1616 Woodall Rodgers Fwy,
Ste. 3M-011
Dallas, TX 75202-1234
214-486-4245
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4D52A9D6City...10/17/2011