ST1002-CS110224 (10/17/2011) Keith Marvin - RE: Oncor OH to UG at 3 Bethel Rd. IntersectionsPage 1 From: <Richard.Brewster@oncor.com> To: <kmarvin@coppelltx.gov> Date: 2/24/2011 3:54 PM Subject: RE: Oncor OH to UG at 3 Bethel Rd. Intersections Keith, I have prepared the estimate for the single phase line just east of Loch Ln. and it looks like this should be around $15,000. The same rules apply about easements and future overhead crossings, though at this location that should never be an issue. Let me know if you need anything else. Richard Brewster Oncor Electric Delivery 1616 Woodall Rodgers Fwy, Ste. 3M-011 Dallas, TX 75202-1234 214-486-4245 -----Original Message----- From: Keith Marvin [mailto:kmarvin@coppelltx.gov] Sent: Monday, February 21, 2011 10:10 AM To: Brewster, Richard Subject: Re: Oncor OH to UG at 3 Bethel Rd. Intersections Richard, I think I have a total cost worked out based on your estimates. The only question I have right now concerns the single phase distribution line that crosses Bethel Road East of Loch lane. This line appears to feed the homes on the east side of Loch Lane. Can I use the same estimate as the service lines for this one ($6,500)? Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> <Richard.Brewster@oncor.com> 2/17/2011 9:59 AM >>> Keith, I have completed the 3 preliminary estimates that you requested crossing Bethel Rd. Listed below are the approximate amounts: Estimate 1 - Crossing Bethel Rd. just west of S. Coppell Rd. across from the old farmer's market - approx. cost is $35,000 - includes simply burying the existing overhead crossing using poles already in place Estimate 2 - Crossing S. Coppell Rd. just north of Bethel Rd. - approximate cost is $40,000 - includes adding 2 new poles for the new risers Estimate 3 - Crossing Bethel Rd. at S. Coppell Rd. just east of the deli - approximate cost is $38,000 - includes adding 1 new pole for one of the risers As with the prior estimates, please be aware that these are PRELIMINARY costs only. They do not (10/17/2011) Keith Marvin - RE: Oncor OH to UG at 3 Bethel Rd. IntersectionsPage 2 include excessively deep bores, or other factors that may come into play depending on the SUE information. This also does not preclude Oncor from installing overhead lines in the future if the load dictates new feeders. All easements, if there are any, would be the responsibility of the City (I don't anticipate any at this time). If you need further information, or clarification of the estimates, please let me know. Richard Brewster Oncor Electric Delivery 1616 Woodall Rodgers Fwy, Ste. 3M-011 Dallas, TX 75202-1234 214-486-4245 -----Original Message----- From: Keith Marvin [mailto:KMARVIN@coppelltx.gov] Sent: Monday, February 14, 2011 9:18 AM To: Brewster, Richard Subject: Re: Scan from a Xerox WorkCentre Thanks Richard. We have looked at this and would like you to proceed with a cost estimate with all three of these crossings. Keith -----Original Message----- From: <Richard.Brewster@oncor.com> To: Keith Marvin <KMARVIN@coppelltx.gov> Sent: 2/10/2011 8:41:55 AM Subject: FW: Scan from a Xerox WorkCentre Keith, Please review this rough sketch and let me know if you want me to continue with the estimate to place the facilities underground. Call if you have any questions. Thanks! Richard Brewster Oncor Electric Delivery 1616 Woodall Rodgers Fwy, Ste. 3M-011 Dallas, TX 75202-1234 214-486-4245 -----Original Message----- From: WRT043425E@txu.com [mailto:WRT043425E@txu.com] Sent: Thursday, February 10, 2011 8:38 AM To: Brewster, Richard Subject: Scan from a Xerox WorkCentre Please open the attached document. It was scanned and sent to you using a Xerox WorkCentre. Attachment File Type: PDF (10/17/2011) Keith Marvin - RE: Oncor OH to UG at 3 Bethel Rd. IntersectionsPage 3 WorkCentre Location: EP 24-090 Device Name: XRX0000AACF6F6E For more information on Xerox products and solutions, please visit http://www.xerox.com