Loading...
ST9505-LR 950607Hooper Engineering Laboratories, inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Prentiss Properties DATE: PROJECT: Executive Drive, Coppell, TX SUPPLIER: LOCATION OF POUR SET 3: Sanitary sewer manhole, Station 8+80 LOCATION OF POUR SET 4: 5x3 box culvert junction, floor slab 95.1053 7 June 1995 SAMPLE DATA: SET 5 SET 6 MIX NO. Truck No. Cement Ticket No. Flyash Time Batched Sand Time Sampled in. Concrete Temp. (ASTM C1064) 1.0 in. Air Content (ASTM C231) Water Unit Weight (ASTM C138) Admix # 1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39} (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Number Inches Days Date (ASTM Cl 43) Total Load Compressive Required Pounds Stren.gth 28-Day ps, Strength 3 28 07/05/95 4 28 07/05/95 5 7 06/14/95 6 7 06/14/95 7 28 07/05/95 8 28 07/05/95 28-Day Average 134,500 4760 128,800 4550 28-Day Average 4200 4200 NOTE: Cylinders and all information furnished by contractor. TECHNICIAN: DISTRIBUTION: Contractor (1) Prentiss Properties, Tom Navin (1) North Texas Contracting (1) City of Coppell Engineering 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 ALPHA TESTING, [ ;. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPG,-(T OF FIELD COMPACTION TESTS TESTEDFOR: W.O.C. INVESTMENTS, INC. DATE: 06/07/95 C/O FINLEY DEVELOPMENT ADDISON, TEXAS PROJECT: WOODLANDS OF COPPELL COPPELL, TEXAS OUR REPORT NO. 95230--5 TEST DATA: TEST I DATE [ ~LEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSI~ COMPACTION COMMENT* NO.I /DEPTH ~ NUMBER % PCF % PCF 6 06/07 FG-8.0 I 15.9 110.9 14.9 108 97 1-A 7 06/07 FG-7.5 1 15.9 110.9 15.6 108 98 1-A 8 06/07 FG-7.0 1 15.9 110.9 16.2 108 97 i-A 9 06/07 FG-6.5 1 15.9 110.9 16.5 lOB 98 1-A 10 06/07 FG-6.0 1 15.9 110.9 15.3 109 98 1-A 11 06/07 FG-5.O 1 15.9 110.9 15.7 108 97 1-A 12 06/07 FG-4.5 1 15.9 110.9 16.1 108 98 1-A TEST LOCATION: 6 DARTMOUTH LANE STA. 0+00 Q CENTER LINE 7 DARTMOUTH LANE STA. 0+10 Q CENTER LINE 8 DARTMOUTH LANE STA. 0+20 · CENTER LINE 9 DARTMOUTH LANE STA. 0+35 0 CENTER LINE 10 DARTMOUTH LANE STA. 0+15 8 CENTER LINE 11 DARTMOUTH LANE STA. 0+20 Q CENTER LINE 12 DARTMOUTH LANE STA. 0+20 8 CENTER LINE 1. FILL 2. NATURALSUBGRADE 3. LIME STABILIZED 4. CEMENTTREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST Respectf