Loading...
ST9505-LR 950609Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Prentiss Properties DATE: 9 June 1995 PROJECT: Executive Drive, C0ppell, TX JOB NO.: 95.1053 MATERIAL DESCRIPTION: 1) On-Site Fill - Dark Grey Clay & Tan Clay ASTM D 698 STANDARD PROCTOR: 1) 93.0 pcf @ 25.0% Moisture 22) 23) 24) LOCATION PROCTOR LIFT Backfill Over Sanitary Sewer Line B approx. Station 0 + 25 Backfill Over Water Line approx. Station I0 + 00 approx. Station 11 + 50 BELOW SUBGRADE 4'-5' MOISTURE DRY PERCENT CONTENT DENSITY COMPACTION % PCF % 23.3 95.0 102.2 1 3' 27.7 93.6 100.6 1 Fin. Sub. 25.6 93.7 100.7 REQUIRED COMPACTION % 95+ -2% to +4% Of Optimum TECHNICIAN: DISTRIBUTION: CDJ (1) Prentiss Properties, Tom Navin (1) L. H. Lacy Company (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148