Loading...
ST9505-LR 950526Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Prentiss Properties DATE: 26 May 1995 PROJECT: Executive Drive, Coppell, TX JOB NO.: 95.1053 MATERIAL DESCRIPTION: 1 ) On-Site Fill - Dark Grey Clay & Tan Clay ASTM D 698 STANDARD PROCTOR: 1) 93.0 pcf ~ 25.0% Moisture 5) 6) LOCATION PROCTOR LIFT Backfill Over Storm Sewer Line Station 3 + 50 Station 3 + 00 BELOW SUBGRADE 2' t MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 29.0 28.5 90.9 97.7 95+ -2% to +4% 91.0 97.8 Of Optimum TECHNICIAN: DISTRIBUTION: CDJ (1) Prentiss Properties, Tom Navin (1) L. H. Lacy Company (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148