ST8804-LR 900709 BAKER. SHIFLETT, /nc.
~~ ~E, ng neers
~ Construction Materials Engineering Division
July--9, 1990
ABQ Development Corporation p~oJ~: Heatz Road; Tract 7
P.O. Box 25625
Albequerque, New Mexico 87125 LOCA~ON: Coppell, Texas
Attn: Ms. Mary Hicks RKPORT NO: 892544-5
RESULTS OF FIELD DENSITY TESTS
TEST LABORATORY COMPACTION FIELD COMPACTION
DATE TEST LOCATION
NO. CURVE MOISTURE DENSITY COMPACTION
NO. OMC, % MOD, pcf % pti %
FIRE PIT/STA IO+00Elll+O0 E;
180' TO 215' N OF S PROPERTY LINE:
96 7-05 East End -6' HR-6&7 9.7 124.8 9.2 118.6 95
97 West End -6' HR-6&7 " 11.2 120.0 96
98 . East End -5' HR-6&7 9.5 118.7 95
99 West End -5' HR-6&7, " 10.2 I19.0 95
100 " Middle -4' HR-6&7 " 10.7 118.8 95
IO1 West End -2' HR-6&7 " 9.4 118.5 95
102 " Middle -3' HR-6&7 " 10.4 118.4 95
103 " East End -2' HR-6&7 " 9.5 119.7 96
104 " Middle -1' HR-6&7 " 9.8 118.5 95
105 " East End Final HR-6&7 ' " 10.1 119.6 96
106 " West End Final HR-6&7 " " 10.2 119.4 95
TEST METHODS: AS/M O 2922, O 3017,
REMARKS: Tests performed by T. ~ompson.
F - Final lift 01556, D 2167 or O 2937
Depths are measured from surface elevations.
BAKER-SHIFLETT, INC.
2 Above
1 Mr. Jerry Parche', P.E.
1 City of Coppe~l
Attn: Mr. Larry Davis
1 James Arnold Construction
Attn: Mr. Jerry PheLps David R. Friels, P.E.
5450 East Loop 820 South P.O, Box 15822 Fort Worth, Texas 76119 (817)478-8254 Metro 572-3411