December 6, 1999
Mr. Kenneth M. Griffin, P.E.
City of Coppell
Post Office Box 478
Coppell, Texas 75019
Addition of Pump Number 4 to the Village Parkway Pump Station
Project Number WA99-03; Bid Number Q-119902
Award Recommendation
Dear Mr. Griffin:
We have checked the bids received on December 3, 1999, for the Addition of Pump Number 4 to the Village
Parkway Pump Station. Along with the installation of Pump Number 4, this project includes the construction
of isolation valves on the existing three large pumps and replacement of the pump station flow meter. We are
enclosing six copies each of the Bid Tabulation and the Tabulation of Pump Bids.
Architectural Utilities, Inc. (AUI) of Forth Worth, Texas submitted the low bid for construction of this project
in the amount of $346,000. We are familiar with this contractor, as they have completed several of our
projects. They are currently 25% complete on a pump station for the City of Desoto, which was designed by
our firm. Nonetheless, we have further investigated their experience, equipment and financial standing. They
have completed similar projects in the City of Hurst, Lewisville and Grapevine. In 1995 they completed the
Belt Line Road Water Line project for the City of Coppell. As such we have concluded that Architectural
Utilities, Inc., is qualified and has the equipment and financial capability to successfully complete this project.
Separate bids, addressed to the successful contractor, were received from pump manufacturers for the pump
and motor for this project. Oslin Nation Company submitted the best bid, in our opinion, for the Ingersoll-
Dresser Pump Model 300 LNN-575 with a 600 Horsepower, 4160 volt General Electric motor. The amount of
the bid was $85,684.00, and equipment delivery is expected by April 15, 2000, if an award is made by mid
December of this year.
The bids for construction of this project included a pump and motor allowance of $75,000.00. The
recommended best bid for the pumps and motors is $85,684.00, therefore a change order in the additive
amount of $10,684.00 is to be executed with the original construction contract.
\\engineering\sjf-sjf-v~2sj~pr~jects\c~erica~\c~ppe~\99~53\~etters~c~ns~k\award.d~c
! '-~
Mr. Kenneth M. Griffin, P.E.
City of Coppell
December 6, 1999
Page Number 2
Accordingly, we recommend the City of Coppell award a contract for the Addition of Pump Number 4 to the
Village Parkway Pump Station in the amount of $346,000 to the low bidder on this projcct, Architectural
Utilities, Inc., of Fort Worth, Texas. Concurrently an additive change order in the amount of $10,684.00 for
the difference between the bid allowance and the recommended bid for the pump and motor should be
approved. This will revise the contract amount to $356,684.00.
We are available to discuss our recommendation and this project further at your convenience.
Sincerel y,
tdricks, P.E:
Enclosures
CITY OF COPPELL, TEXAS
Addition of Pump No. 4 at the Village Parkway Pump Station
Project No. WA99-03; Bid No. Q-119902
TABULATION OF BIDS
Bids Received Until 2:00 p.m., Friday, December 3, 1999
Contractor
Architectural Utilities, Inc.
P. O. Box 11586
Fort Worth, Texas 76112
Red River Construction, Co.
1506 Capital Ave., #200
PIano, Texas 75074
Triple D, Inc.
P. O. Box 1149
Keller, Texas 75244
Total
Amount of
$ 346,000.00
$ 357,500.00
$ 354,900.00
4
Systems Integration, Inc.
7316 Business Place
Arlington, Texas 76001
$ 440,500.00
2
Oslin Nation Company
5440 Redbird Center Dr.
Dallas, Texas 75237
Jersey Equipment Company
217 S. Stemmons Expwy., #204
Lewisville, Texas 75067
PUMP SUPPLIERS
Manufacturer
Ingesoll-Dresser Pump Co.
ITT-AC Pump Co.
Amount of
Prooosal
$ 85,684.00
$ 87,078.00
'Delivery
(Weeks)
April 15, 2000
18-Weeks
J:\Co!~elggg I 53%zpeuMtchXPkBS-2-xls
!
TABULATION OF BIDS
PROJECT: CITY OF COPPELL, TEXAS
Addition of Pump No. 4 at the Village Parkway Pump Station
Project No. WA99-03; Bid No. Q-119902
l* I Ea,
2 I L.S.
3 3 Ea.
4 I L.S.
Date: Deccmher 3, 1999
SHIMEK, JACOBS & FINKLEA, L.L.P.
CONSULTING ENGINEERS
Dallas, Texas
DESCRIPTION
For Furnishing a 9,000 Gallon per Minute, 215-Feet Total Dynamic Head Horizontal Split Case
Pump and 600 Horsepower, 4160 Volt Motor, complete to the Job Site
For Installing One Horizontal Split Case Pump and Motor, and Furnishing and Installing all
necessary Elecl~/cal Equipmcnl, Control Valves, Piping, Fittings, Wit/rig, Conduit Pump Pads,
Valve Suppo~s, Painting, SCADA Connections, and all other Equipment to make Pump No. 4
Fully Operational
Architectural Utilities, Inc.
P. O. Box 11586
Fort Worth, Teyats 76112
UNIT BID [ EXTENSION
PRICE
BID OF
R~ River Construction, Co. Trip
1506 Capital Ave., #200
Plano, Texas 75074 Keller,
UNIT BID { UNIT BID
PRICE EXTENSION PRICE
$ 75,000.00 S 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.1~
$ 220,000.00 $
For Furnishing and Installing 24-1nch Butterfly Valve in th~ Discharge Piping of Existing Pump
Nos. l,2and3 $ 8,000.00 $
For Removing the Existing Vontori Meter and P~ssurc TransmiRer in the Existing Meter Vault
and Replacing with a 36-1nch Windowed Spool Time Transit Meter, including all Elecl~cal and
SCADA Connections $ 27,000.00 $
TOTAL AMOUNT BID (Items I Through 4)
220,000.00 $ 232,000.00 $
232,000.00 $ 232,000.0
24,000.00 $ 9,500.00 $ 28,500.00 $
27,000.00 $ 22,000.00 $ 22,000.00 S 23,000.1)i
$ 346,000.00 $ 357,500.00
|ID OF BID OF
pie D, lnc, Systems Integration, Inc.
.. Box 1149 7316 Business Place
Texas 75244 Arlington, Texas 76001
[1 UNIT BID
EXTENSION PRICE EXTENSION
S 75,000.00 $ 75,000.00 $ 75,1Y '~
$ 232,000.00 $ 254,800.00 $ 254,800.00
$ 24,900.00 $ 24,000.00 $ 72,000.00
$ 23,000.00 $ 38,700.00 $ 38,700.00
$ 354,900.00 $ 440,500.00
. .~
*Bid ~411owance Item
t xCqnpdlw~lS3~x~wt'~s:hxl, aBS-2.xhs Page 1 of 1