WA9903-CN 991206SHIMEK, JACOBS & FINKI,EA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOB& P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P.E. December 6, 1999 Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Addition of Pump Number 4 to the Village Parkway Pump Station Project Number WA99-03; Bid Number Q-119902 Award Recommendation Dear Mr. Griffin: We have checked the bids received on December 3, 1999, for the Addition of Pump Number 4 to the Village Parkway Pump Station. Along with the installation of Pump Number 4, this project includes the construction of isolation valves on the existing three large pumps and replacement of the pump station flow meter. We are enclosing six copies each of the Bid Tabulation and the Tabulation of Pump Bids. Architectural Utilities, Inc. (AUI) of Forth Worth, Texas submitted the low bid for construction of this project in the amount of $346,000. We are familiar with this contractor, as they have completed several of our projects. They are currently 25% complete on a pump station for the City of Desoto, which was designed by our firm. Nonetheless, we have further investigated their experience, equipment and financial standing. They have completed similar projects in the City of Hurst, Lewisville and Grapevine. In 1995 they completed the Belt Line Road Water Line project for the City of Coppell. As such we have concluded that Architectural Utilities, Inc., is qualified and has the equipment and financial capability to successfully complete this project. Separate bids, addressed to the successful contractor, were received from pump manufacturers for the pump and motor for this project. Oslin Nation Company submitted the best bid, in our opinion, for the Ingersoll- Dresser Pump Model 300 LNN-575 with a 600 Horsepower, 4160 volt General Electric motor. The amount of the bid was $85,684.00, and equipment delivery is expected by April 15, 2000, if an award is made by mid December of this year. The bids for construction of this project included a pump and motor allowance of $75,000.00. The recommended best bid for the pumps and motors is $85,684.00, therefore a change order in the additive amount of $10,684.00 is to be executed with the original construction contract. \\engineering\sjf-sjf-v~2sj~pr~jects\c~erica~\c~ppe~\99~53\~etters~c~ns~k\award.d~c ! '-~ Mr. Kenneth M. Griffin, P.E. City of Coppell December 6, 1999 Page Number 2 Accordingly, we recommend the City of Coppell award a contract for the Addition of Pump Number 4 to the Village Parkway Pump Station in the amount of $346,000 to the low bidder on this projcct, Architectural Utilities, Inc., of Fort Worth, Texas. Concurrently an additive change order in the amount of $10,684.00 for the difference between the bid allowance and the recommended bid for the pump and motor should be approved. This will revise the contract amount to $356,684.00. We are available to discuss our recommendation and this project further at your convenience. Sincerel y, tdricks, P.E: Enclosures CITY OF COPPELL, TEXAS Addition of Pump No. 4 at the Village Parkway Pump Station Project No. WA99-03; Bid No. Q-119902 TABULATION OF BIDS Bids Received Until 2:00 p.m., Friday, December 3, 1999 Contractor Architectural Utilities, Inc. P. O. Box 11586 Fort Worth, Texas 76112 Red River Construction, Co. 1506 Capital Ave., #200 PIano, Texas 75074 Triple D, Inc. P. O. Box 1149 Keller, Texas 75244 Total Amount of $ 346,000.00 $ 357,500.00 $ 354,900.00 4 Systems Integration, Inc. 7316 Business Place Arlington, Texas 76001 $ 440,500.00 2 Oslin Nation Company 5440 Redbird Center Dr. Dallas, Texas 75237 Jersey Equipment Company 217 S. Stemmons Expwy., #204 Lewisville, Texas 75067 PUMP SUPPLIERS Manufacturer Ingesoll-Dresser Pump Co. ITT-AC Pump Co. Amount of Prooosal $ 85,684.00 $ 87,078.00 'Delivery (Weeks) April 15, 2000 18-Weeks J:\Co!~elggg I 53%zpeuMtchXPkBS-2-xls ! TABULATION OF BIDS PROJECT: CITY OF COPPELL, TEXAS Addition of Pump No. 4 at the Village Parkway Pump Station Project No. WA99-03; Bid No. Q-119902 l* I Ea, 2 I L.S. 3 3 Ea. 4 I L.S. Date: Deccmher 3, 1999 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS Dallas, Texas DESCRIPTION For Furnishing a 9,000 Gallon per Minute, 215-Feet Total Dynamic Head Horizontal Split Case Pump and 600 Horsepower, 4160 Volt Motor, complete to the Job Site For Installing One Horizontal Split Case Pump and Motor, and Furnishing and Installing all necessary Elecl~/cal Equipmcnl, Control Valves, Piping, Fittings, Wit/rig, Conduit Pump Pads, Valve Suppo~s, Painting, SCADA Connections, and all other Equipment to make Pump No. 4 Fully Operational Architectural Utilities, Inc. P. O. Box 11586 Fort Worth, Teyats 76112 UNIT BID [ EXTENSION PRICE BID OF R~ River Construction, Co. Trip 1506 Capital Ave., #200 Plano, Texas 75074 Keller, UNIT BID { UNIT BID PRICE EXTENSION PRICE $ 75,000.00 S 75,000.00 $ 75,000.00 $ 75,000.00 $ 75,000.1~ $ 220,000.00 $ For Furnishing and Installing 24-1nch Butterfly Valve in th~ Discharge Piping of Existing Pump Nos. l,2and3 $ 8,000.00 $ For Removing the Existing Vontori Meter and P~ssurc TransmiRer in the Existing Meter Vault and Replacing with a 36-1nch Windowed Spool Time Transit Meter, including all Elecl~cal and SCADA Connections $ 27,000.00 $ TOTAL AMOUNT BID (Items I Through 4) 220,000.00 $ 232,000.00 $ 232,000.00 $ 232,000.0 24,000.00 $ 9,500.00 $ 28,500.00 $ 27,000.00 $ 22,000.00 $ 22,000.00 S 23,000.1)i $ 346,000.00 $ 357,500.00 |ID OF BID OF pie D, lnc, Systems Integration, Inc. .. Box 1149 7316 Business Place Texas 75244 Arlington, Texas 76001 [1 UNIT BID EXTENSION PRICE EXTENSION S 75,000.00 $ 75,000.00 $ 75,1Y '~ $ 232,000.00 $ 254,800.00 $ 254,800.00 $ 24,900.00 $ 24,000.00 $ 72,000.00 $ 23,000.00 $ 38,700.00 $ 38,700.00 $ 354,900.00 $ 440,500.00 . .~ *Bid ~411owance Item t xCqnpdlw~lS3~x~wt'~s:hxl, aBS-2.xhs Page 1 of 1