Loading...
ST9505-CS 950831DEVELOPMENT FEES IIPROJECT NAME: IENGINEER: IREVISION DATE: Executive Drive Halff & Associates, Inc. 8/31/95 SENT 7/26/95 6/12/95 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Irrigation Street Escrow Street Cut Permit Overtime Inspection (6/10) Water Tap Inspection Water Meter Fee(Irrigation) Irrigation Meter Deposit TOTALS ASSESSED FEE AMOUNT PAID DATE $3,600.00 93,600.00 8/15/95 99,844.22 99,844.22 4/5/95 9116.00 9116.00 6/29/95 9100.00 9100.00 8/15/95 9173.65 9173.65 8/15/95 935.00 935.00 8/15/95 Total Fees Fees Paid Amount Owed 913,868.87 913,868.87 90.00 4/13/95 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. NOTES ~rior Tn Fin~l~Acceptance Irrigation Plan Approved Erosion Control Maint.