Loading...
WA9601B-CN 990709 SHIMEK, JACOBS & FINKI,EA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. July 9, 1999 JOE R. CARTER, P.E. GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Sandy Lake Road Water Line Change Order Number 2 Dear Mr. Griffin: We are enclosing three fully executed copies of Change Order Number 2 to the City 's contract with Fox Contractors, Inc. for the construction of the Sandy Lake Road Water Line. Change Order Number 2 covers the extra work required to connect to the existing 24-inch water line on the east side of Denton Tap Road. These sets are for your files. We are available to discuss this project further at your convenience .' Since ours Hen 'cks: Enclosure cc: Mr. Larry Davis CITY OF COPPELL, TEXAS Sandy Lake Road Water Line Wagon Wheel Ranch Elevated Tank to Denton Tap Road CHANGE ORDER NO. 2 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Fox Contractors, Inc., P.O. Box 951, Midlothian, Texas 76065, for construction of the Sandy Lake Road Water Line - Wagon Wheel Ranch Elevated Tank to Denton Tap Road, dated December 8, 1998. B. DESCRIPTION OF CHANGE The original plans for this project called for the water line to terminate at Station 117+86.74 with a 24-inch dished head plug on the east side of Denton Tap Road. The City of Coppell has requested that the contractor make the connection to the 24-inch water line in this same vicinity currently under construction by others. This change order covers the extra work required to furnish and install approximately 48 linear feet of 24- inch water line and make the necessary connections to the existing distribution system including all closures, fittings and appurtenances, complete in place. The attached revised construction plan sheet number 11 shows the extra work covered by this change order. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: Item Description Previous Quantity Revised Unit Unit Price Amount of Change No. Quantity This Quantity Change Order 1A 24" Water Line including 0 48 48 L.F. $250.00 $ 12,000.00 'Embedment, extending east of original project 42 Remove existing 24-inch plug and 0 1~ 1 L.S. 5,000.00 5,000.00 connect to existing 24-inch water line, complete in place including all necessary closures, firings and appurtenances 43 Remove existing 6-foot storm sewer curb 0 1 1 L..S. 6,500.00 6,500.00 inlet and replace, complete in place Total Amount of Change: $23,500.00 Original Contract Amount $912,243.50 Change Order No. 1 17,500.00 Change Order No. 2 23,500.00 Revised Contract Amount $953,243.50 \~enginee~ng\~sjf-sjf-v~l~.s~pr~jects\~erica~\c~ppe~x96~5~spe~sxchange~c~-~d~ (6/3/99)Page I of 2 EFFECT OF CHANGE ON CONTRACT TIME The work required under this change order will not add any calendar days to this project. Original Contract Time 200 calendar days Change Order No. 1 0 calendar days Change Order No. 2 0 calendar days Revised Contract Time 200 calendar days C. AGREEMENT By the signatures below, duly authorized agents of the City of Coppell, Texas and Fox Contractors, Inc., do hereby agree to append this Change Order No. 2 to the original contract bet~veen themselves, dated December 8, 1998. City of Coppell, Texas Fox Contractors, Inc. Contractor By: 1 ay: Date: Z-/~ 'ff Date: '7- / -- ~ q Attest: Attest: \\enginee~ng\.sjf-sjf-v~2.sjt~pr~jec~sNc~e~ca~k~ppe~x96~kspe~sk:hange-~\~-2.d~c (6/3/99)Page 2 of 2 CONNELL SKAGS ADDITION j CONNELL SKAGGS ADDITION .~ J.~ LOT ~ ~SEC~N ~_~ ~ ~ ~ ~ ~ING OR ReNRI~ PA~ ~ ~ ~RNE BY ~k II~ ~ 1-16~16= T~NG ~ · V~ 19 ~ I6" ~ ~E (S~) ~IS~NG 16" WA~ UN~ NO ~C ~ ~ BE P~M~ IN ~E ~ T~ ~/ ~DY ~E ~ I~EC~ ~ ~ ~ N 2~I~7966 N ~99~Z~1 E I9~7~90 O E 197~ ~ EZ ST~ 117~56 ~'~.~. . ; 118+3~84 - ~ S~DY ~KE CROSSING S~DY ~KE CROSSING ' LOT 2 LOT 1 ~. +91.87 ~ RE~ C~NGE NO. 2 5/21/99 t495 T_S. BOX ~\T.S, BOX~S VAULT CITY OF COPPELL, TEXAS SANDY LAKE ROAD WATER LINE PLAN-PROFILE STA. 110+00 TO STA. 117+88.56 SHIMEl(, JACOBS & F1NKLEA, LLP. CONSULTING ENGINEERS lY. SI(~qE:D BY:. G.C.H. I PRQ, JECT: 96150 IOF ~HEE'T NO, 110+00 111 112 113 114 115+00 116 117 118 | ORAWN BY: SJ. k F. OAm OCT(Nail, 1~ 11 mETS 11 CITY OF COPPELL, TEXAS Sandy Lake Road Water Line Wagon Wheel Ranch Elevated Tank to Denton Tap Road CHANGE ORDER NO. 2 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of the contract entered into between the City of Coppell, Texas and Fox Contractors, Inc., P.O. Box 95 1, Midlothian, Texas 76065, for construction of the Sandy Lake Road Water Line - Wagon Wheel Ranch Elevated Tank to Denton Tap Road, dated December 8, 1998. B. DESCRIPTION OF CHANGE The original plans for this project called for the water line to terminate at Station 117+86.74 with a 24-inch dished head plug on the east side of Denton Tap Road. The City of Coppell has requested that the contractor make the connection to the 24-inch water line in this same vicinity currently under construction by others. This change order covers the extra work required to furnish and install approximately 48 linear feet of 24- inch water line and make the necessary connections to the existing distribution system including all closures, fittings and appurtenances, complete in place. The attached revised construction plan sheet number 11 shows the extra work covered by this change order. C. EFFECT OF CHANGE ON CONTRACT AMOUNT This change order will have the following effect on the cost of this project: Item Description Previous Quantity Revised Unit Unit Price Amount of Change No. Quantity This Quantity Change Order 1A 24" Water Line including 0 48 48 L.F. $250.00 $ 12,000.00 Embedment, extending east of original project 42 Remove existing 24-inch plug and 0 1 1 L.S. 5,000.00 5,000.0{3 connect to existing 24-inch water line, complete in place including all necessary closures, fittings and appurtenances 43 Remove existing 6-foot storm sewer curb 0 I 1 L..S. 6,500.00 6,500.0C inlet and replace, complete in place To,tal Amount of Change: $23,500.01] Original Contract Amount $ 912,243.50 Change Order No. 1 17,500.00 Change Order No. 2 23,500.00 Revised Contract Amount $953,243.50 \~engineering~.sjf.~sjf-v~2sjf~pr~jects\clerica~\c~pe~X96~5~xspecs~change.~\c~2.d~ (6/3/99)Page 1 of 2 EFFECT OF CHANGE ON CONTRACT TIME The work required under this change order will not add any calendar'days to this project. Original Contract Time 200 calendar days Change Order No. 1 0 calendar days Change Order No. 2 0 calendar days Revised Contract Time 200 calendar days C. AGREEMENT By the signatures below, duly authorized agents of the City of Coppell, Texas and Fox Contractors, Inc., do hereby agree to append this Change Order No. 2 to the original contract between themselves, dated December 8, 1998. City of Coppell, Texas Fox Contractors, Inc. Owner, Contractor ~~' ~,j~ By: ~/gjJ,,a~vbF te: Date: '7 - I - q 5 Attest: Attest: \\en~ineering\.sjf-sjf-v~2.sjtx~r~jects\c~erica~ppe~lx96-l5~spe~sM:hange~~\e~.2.d~ (6/3/99)Page 2 of 2 CONNELL SKAGGS ADDITION CONNELL S~GS ADDfflON LOT ~ /~ ~ ~or TO ~ ~0~ OR O~SE ~C~. (~ I~EC~ PHO~S 7-11 ~ ~ · ~Sr~ ~E ~C~ ST~ 114+~ ~ /9 ~ 16' WA~ UNE (~) P~M~ ~ ~E ~ T~ ~{ ~DY ~E ~ I~EC~ N 199~7~I E 1979~7~ E 197~ ~ SANDY ~KE CROSSING SgDY ~KE CROSSING ' T.S. ',\T.S. BOXES \ VAULT CITY OF COPPELL, TEXAS SANDY LAKE ROAD WATER LINE PLAN-PROFILE STA. 110+00 TO STA. 117+88.56 SHIMIEK, JACOBS &: FINKLEA, LLP. CONSULTING ,ENGINEERS DrcSiGHrn BY:. G,C.H, I PROJECT: 96150 CF SHE'T NO, I 110.+00 111 112 113 114 1154-00 116 117 118 J [:X~kWN BY:. S.J. & F. DATE: 0C~ue,~,, t998 .H11