Loading...
ST9605-CS 980625 · . Coppell, Texas 75019 ~ ~ The City With A Beautiful Future~COPPELL,P'O' BOX 478TEXAS 75019 972-462-0022 June 25, 1998 Mr. Jim McElroy T/E Freeport North Land II 10005 W. Technology, Suite 151 Dallas, TX 75220 RE: Street Sign Fee Assessment / Northpoint Dear Mr. McEkoy: Enclosed with this letter you will find the street sign assessment for Northpoint. Prior to the final acceptance of this project, a check in the mount of $117.54 should be made payable to the City of Coppell and forwarded to Jennifer Armstrong, Finance Director, along with a copy of the attached street sign fee assessment list. Please provide a copy of your paid receipt to our office so that we will be able to verify payment of the required fees and assure a successful completion of this project. If you should have any questions please feel free to contact me at your convenience. Sincerely ~9, Director of Engineering and Public Works cc: Jennifer Armstrong, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works TO: Doug Stevens, Engineering Technician FRCM: Per Birdsall, Sign/Signal Technician RE: Street Division Sign Fee For The following fee should be assessed and collected on ~e ~ove referenced project. 100% due prior to final acceptance of project. S~eet Si~ F~ The following assessment is being made in accor~nce wi~ ~e ~ty of Coppell S~vision Ordnance ~pen~x A ~apter VIII A. ~e following cost of ~ose sign materials re~ired are based on current pricing which is reviewed on a re~lar basis. No Parking $54.12 Street N~es $71.88 Yield w/n~es $90.41 Stop w/n~es $100.14 War~ng Sign $64.68 Keep ~ght (me, an) $58.77 Object ~rkers (L&R) $34.57 * cost breakdowns may be obtained by written request sign fee Revised 4/10/98