WA9903-CN 991117 (2)SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS Project No. Client: CityofCoppell Date: 11/17/99 Project: Village Parkway Pump Station Additions Installation of Pump Number 4 and Isolation Valves on 1, 2 and 3 By: GCH ENGINEER'S OPINION OF CONSTRUCTION COST Item No. Description I Quantity I Unit I Price Amount Brief Project Description: Installation of Pump Number 4 to operate at 9,000 gpm at 210 TDH (600HP Ingersoll-Dresser 300 LNN- 575) along with a 20" Tilted Disc Pump Control Valve and Soft Start Motor Control Center. Project includes the installation of 24-ineh butterfly valves on the discharge side of Pumps 1, 2 and 3 and an additive alternate bid for the replacement of the Venmtri Meter. Furnish 600 HP Pump and Motor: 9,000 gpm ~ 210 Ft TDH (Ingersoll-Dresser300-LNN-525) 1 L.S. $ 75,000.00 $ 2 Installation of Pump Number 4 and Motor 1 L.S. $ 25,000.00 $ Furnish and Install 20" Tilted Disk Pump Contxol Valve with Bottom 3 Mounted Dash-pot 1 Ea. $ 16,000.00 $ 4 Pump Number 4 - 4160v Motor Contxol Center and Soft Start Furnish and Install 24" butterfly Isolation Valves on Discharge 5 Header of existing Pumps 6 Pump Number 4 - 30" Suction Side Isolation Valve 7 Pump Number 4 - 24" Discharge Side Isolation Valve 8 30" pump suction piping 9 24" pump discharge piping 10 Bends, Fittings, Redricers and Couplings 11 30-inch suction side pipe insulation 12 Pipe and Equipment Painting 13 SCADA System Modifications Contingencies and Miscellaneous Items SubtotM: Tot~: Additive Alternate Bid: Remove existing Venturi Flow Tube and Transmitter and Replace with Badger 4500 Transit Time Flow Meter with Windowed Spool 14A Piece I L.S. $ 50,000.00 $ 3 Ea. $ 12,500.00 $ I Ea. $ 7,500.00 $ 1 Ea. $ 6,500.00 $ 20 L.F. $ 175.00 $ 10 L.F. $ 150.00 $ 1 L.S. $ 7,500.00 $ 1 L.S. $ $ I L.S. $ 1,500.00 $ I L.S. $ 3,000.00 $ 10% USE: 75,000.00 25,000.00 16,000.00 50,000.00 37,500.00 7,500.00 6,500.00 3,500.00 1,500.00 7,500.00 1,500.00 3,000.00 234,500.00 23,450.00 257,950.00 260,000.00 1 L.S. $ 20,000.00 $ 20,000.00 Total Project Cost Base + Additive Alternate Bid: Other City of Coppert Project Cost: Total Project Construction Budget: 280,000.00 2 [ Ea. [ $ 33,000.00 [ $ $ 66,000.00 346,000.00 Page I of/