Loading...
ST9605-CS 970903 Coppell, Texas 75019 ~~) The City With A Beautiful Future 214-462-0022 September 3, 1997 Andre Taylor Rust Lichliter/Jameson 1420 W. Mockingbird Lane, Suite 300 Dallas, TX 75247-4906 RE: Northpoint Drive Extension / Construction Plans Dear Mr. Taylor: The City of Coppell has received and reviewed the referenced plans and has the following comments to offer: 1. Construct ADA ramps at the intersection of S.H. 121 frontage road and Northpoint Drive. 2. Provide a cross section view of Northpoint Drive with a 6" crown. 3. Provide a note to remove existing asphalt in the existing median at the west end of the existing Northpoint Drive. 4. Provide drainage easement documents for the easements located on the north and south side of Northpoint Drive at the S.H. 121 frontage road. Also, a letter of permission will be needed to grade to drain on the south side of the proposed double 5'x2' box culvert (see sheet 5 of 11). 5. Eliminate the proposed 45 degree angles in the proposed water line where it connects to the existing water line in Northpoint Drive. 6. A TxDOT permit must be provided to the City before construction will be allowed to begin. 7. Revise the note regarding the contact for Lone Star Gas on sheet 7 of 11. 8. Provide a railing on the south side of the double 5'x2' box culvert headwall. 9. Provide a map showing the locations of cross sections in the HEC-2 hydraulic models which have been submitted to the City. There are various other minor comments throughout the plans. Once these comments have been addressed, the marked up plans along with two revised sets of plans should be resubmitted to the City for review. If you should have any questions concerning these comments, please contact me at 304-3681. Sincerely Michael A. Martin, P.E. Assistant City Engineer