CITY COUNCIL MEETING: June 8, 1999 ITEM # ~7__
ITEM CAPTION:
(
Consider approval of Change Order #3 for the Sandy Lake Road Water Line Project #WA 96-01 to Fox
Contractors, Inc. in an amoun~..~,rs~}~xceed $250,000; and author~g ~c Mayor m si~.
APPROVED
SUB~IT~D BY: Ke~e~ ~. Gfi~, ~.~. ~ ~ ~~ ~~ ~
ST~F COUNTS:
During easement negotiations for the route to imta~ the 24" water line west ~om State Road to ~e new elevated
storage ink, it has become clear ~at the tern of which ~e prope~ owner ~ reques~g is not in ~e best ~terest
of the Ci~. Most recent revisions ~om the prope~ omer's representative include lan~age about the waiver of aH
~mre water impaG fees. This is agreeable to the Ci~, however, ~ere is also language concem~g ~e waiver of all
~mre roadway impaa fees for ~e development of ~e land. ~e land itself is approximately 100 a~es and ~e
waiver of all ~mre impa~ fees for ~e roadway could be ~e waiver of a substantial doll~ amount. ~e Ci~ needs
53,492 square feet of easement, 116,915 square feet of tempora~ cons~ion easement ~d 13,068 square feet of
right-of-way ~om th~ prope~ om~.
The City has continued negotiations with the property owners, however, we have also explored other options to
install the 24" water line. The suggested change order is to reroute the proposed 24" water line south on State Road
to the northern edge of the Wagon Wheel Park property. At that point it is recommended to bore about 468 feet
under the existing creek to save the creek and the trees along the creek bank. The remainder of the distance from
the creek to the elevated tank would be open cut along the northern edge of the Wagon Wheel Park property;
working around as many trees as possible. All easements and right-of-way necessary for the installation of the water
line along this route are currently in place. The majority of the amount of the cost associated with this change order
is to provide options to $182,500 for the 468 feet of boring under the creek. The final cost of the change order is still
being negotiated with the contractor.
Staff is still negotiating for easements along the original route and price considerations along the alternate route.
However, to provide options to expedite the installation of the water line to ensure that the elevated tank can be
supplied with water ~/nd brought on-line as soon as possible, staff recommends approval of the change order in an
amount not to exceed $250,000 and authorizing the Mayor to sign. Staff will be available for questions at the
Council meeting.
BUDGET AMT. $ AMT. EST. $ +X-BID $
FINANCIAL COMMENTS:
Funds for this change order will be transferred from the 1997-98 Excess Revenues of
the Water/Sewer Fund.
DIR. INITIALS: YT FIN. REVIEW} CITY MANAGER REVIEW:
Agenda Request Form - Revised 2/99 Document Name: #06082
'l'13ddO~)
CITY OF COPPELL, TEXAS
Sandy Lake Road Water Line
Wagon Wheel Ranch Elevated Tank to Denton Tap
CHANGE ORDER NO. 3
A. INTENT OF CHANGE ORDER
The intent of this change order is to modify the provisions of entered into between the City of
Coppell, Texas and Fox Contractors, Inc., P.O. Box 951, Mi Texas 76065, for construction of the
Sandy Lake Road Water Line - Wagon Wheel Elevated Tank to Denton Tap Road, dated
December 8, 1998.
B. DESCRIPTION OF CHANGE
At the request of the City of Coppell, the alignmen 24-inch water line from Station 2+ 15.30 (Start) to
Station 45+49.73 (State Road) is hereby revised on revised construction plan sheets 1A through 5.
The revised sheets are marked with "Change Number 3" along the lower border and are hereby made
a part of this change order by reference. As a '.ult of the re-alignment, the project quantities are revised as
shown in Section C of this change order.
C. EFFECT OF CHANGE ON
This change order will have the follow effect on the cost of this project:
Item Description ' Previous Quantity Revised Unit Unit Price Amount of Change
No. Quantity This Quantity
Change
Order
1 24" Water Line including Embedm t 8,533 (2,398) 6,135 L.F. $59.50 $ (142,681.00)
(Original Route -Delete)
1R 24" Water Line including Embe ment (Sta. 0 1,707 1,707 L.F. $71.50 $ 122,050.50
24+30 to 44+22)
2 24" Water Line by other th Open 292 (60) 232 L.F. $265.00 $ (15,900.00)
Cut(Original Route-Delete
2R 24" Water Line by other an Open Cut (Re- 0 217 217 L.F. $330.00 $ 71,610.00
route)
3R 24" Waterline w/36" 16" Thick Steel 0 468 468 L.F. $390.00 $ 182,520.013
Encase. Pipe (Re-ro e)
7 12" PVC Waterlin with Embedment 304 (54) 2513 L.F. $27.00 $ (1,458.00'~
10 6" D.I.P. Water ine with Embedment 74 25 991 L.F. $22.00 $ 550.0C
12 182'G~22 5 (1) 4 Ea. $1,000.00 $ (1,000.00~
13 " 8 1 9 Ea. $600.00 $ 600.00
14 6" Gate Valve 4 (3) 1 Ea. $480.00 $ (1,440.00)
15 8" x 8" Tapping Sleeve and Valve 5 1 6 Ea. $1,900.00 $ 1,900.00
16 12" x 12" Tapping Sleeve and Valve 1 (1) 0 Ea. $2,700.00 $ (2,700.00)
j:\clerical\coppellL96-150',specs\change-o\co-3.doc (6/4/99) Page 1 of 2
18 Y' Air &Vacuum Release Valve 4 (1) 3 Ea. $3,500.00 $ (3,500.00'~
19 6" Blow-Off Valve 4 1 5 Ea. $2,000.00 $ 2,000.00
28 Asphalt Pavement 315 135 450 S.Y. $32.00 $ 4,304.00
Total Amount of Change: $ 216,855.50
Original Contract Amount $912,243.50
Change Order No. 1 17,500.00
Change Order No. 2 23,500.00
Change Order No. 3 216,855.50
Revised Contract Amount $1,170,099.00
B. EFFECT OF CHANGE ON CONTRACT TIME
The work required under this change order will not add any calendar days to this project.
Original Contract Time 200 calendar days
Change Order No. 1 0 calendar days
Change Order No. 2 0 calendar days
Revised Contract Time 200 calendar days
C. AGREEMENT
By the signatures below, duly authorized agents of the City of Coppell, Texas and Fox Contractors, Inc., do
hereby agree to append this Change Order No. B to the original contract between themselves, dated
December 8, 1998.
~X]~i;~;,,co e,, e:!^ Fox Contractors, Inc.
Date: 6- $-
A~es~ A~est:
j:Xclefical\coppell~96-150xspecs\change-o\co-3,doc (6/4/99) Page 2 of 2
SN]3NION30NU,'qRSNOO
',4"1'~ 'V3~HNI4 :~ S803VP
66/~t/s
manNonv assyea '~7 A8 a3~Vd3Bd
£ 'ON ~3a~o 30NVH3
dVIq NOIJ.V30'I
*:l*cl 'uhU.!aO '1~ Ll.l. euueN
~S ~HSRSYlS] ~ [
~e~zo ~ ~o ~-~s azHv/o~oo~ ~nd srx~z B33NION3 All9
3HZ NO 03578 ION SI OAIV XTNO lO311~ld SII~Z QZ
~/:f133dS 57 1;23/1~Yct Sl/~[ ~tQ:f tf/~,~Lq 3ZYN/(2~/OO3 3/JJ :wON
V~ sdmll~qd ADI3
.o~vom , B30VNV~ ALIO ALRd3a
103POad I
SqWIqO NOILONBISNO0
0aVONViS nn3aaoo Jo Luo - snw~o IHh~ LU!~
~[99+/L L 'VIS Ol 00+0 L L 'VIS 3~lJOad-NV~d
00+0 L ' Oi 00+6 'VlS 3nlJO~d-NV~d 0 B3OVNVffi AIIO
~oA
00+99 'VIS O/00+~ 'V/S 3~IJO~d-NV~d 9 S~H~., m. '" ~ ~ JeleeqAh/dJD~
· . _
se6Jn~S >IonNO
'! OXDyq AUUD~
~7 .~3o ~o~ ~,,~ UOSSD~ XUUDa
;, jGi:)uDxelV UDLUJON
· LUG/--OJcl
NOI/clIBOSqO/33HS 'ON
X3aNI 133HS 'liONriO0 },/1:::)
G.In)~n-I InJ!~nDG8 V
L O-g60 L 0 'ON Ol8 '~> V L 0-96 'oN J. oe[o-~d
OVOB dVl NOLN3O :01 39VBOIS 031VA3'13 HONVB 'I33HM NOOVM :~OBJ
9NI1 UqlV/ OVOB 9)1V1 AONVS
I ~o~ 6661. 'XY~ .'~va I "~ ~ 'r's ~e ~n~a ~ "' ~ ~ ~ X X X X X X
s~3~Nto,~ ~N~ns,oo ~
00+~ ~S O~ ~'~0+~ 'V~S ~ o~ ~ Ee/z~/g ' 0~
~l~OBd-N~d ~ , ,i~ ~ ~ ~ ON m3ou<3~mo v
3NR B31VM aVOB 3~ XONYS ~ ~
SVX31 'll3ddO0 ~0 ~110 ~ ~ ~g~ ~
OOg ~ ~ OOg
gOg J J ~ ~ gOg
. ~ I ~ ~ .
~ i
I LBL '~ '~196 ~ J ~ON 3~ O~ n~d~d ~33~ 3~
~H3dOHd ~d~3 ~ ~ 3~ NO 3N~ ~H3d~d 3~
~ ~+~ Y~S 7~ .
· ~ , , ~0 ZL , . , " , ~ '
~'~ .~L
~ ~ .... ~o .~ "' ~ ~o. t~ "
I
9Z+l YIS 7~ ~7d .t~ ~SI~
103~8d Sl~ N~3~
ZgZ '~ '6~6g ~
~3 ~ 3SOP
I
I
Srk m+25 | JOSE A. ESTEVE
FURNISH &: IA~ALL VOL 8gOg9, PG. 757
l-J' AIR & V~2UUM
~ RELF_ASE VALVE
P.k STA. 7+68 N 183~5.0078
"-~ ~ = 6'266~4" RT. E/2232.5918 ~
N 18314.0036 r
t~) 1R, OAK . ) TOP BANK DRAW v.-
..............
E 122077679
CITY OF COPPELL ( s.s.
,vo~. VOL. 96164, PG. 197
1. All WORK I$ TO BE CONFINED TO THE SOUTH SlOE OF THE 1 ~
PROWl)' UNE ON THE C. IPI OF ~PP~LL PI?~ THE CI1Y
HAS N~T ARRANGED FOR TEMPORARY ACCESS TO THE ADJAO~rT
PROPel)' TO THE
~,o / ~,{""-~.~, //'""'~'""""' "' "'-~-_ '
""'~~'~, ~ 510
505 ~ //-~ "'F" ~ ~ ~ ----.~~. I~,~_ \ 505
'>' i I I '-p-~ .~ --L -'J-- ~oo
495 -241 ~.L oN -16 7ox 495
, ~--
490 ~ ~ ~i~ ~l~__ ~ 4-90
485 ,~K ,~~ ~ 485
15+00
.~ CITY OF COPPELL, TEXAS
480 ~ ~
,~~, J SANDY ~KE ROAD WATER LINE
c~~GE ~[~ ~. ~ ~ ~~ / ~4 P~-PROFI~
~ ~% RI~D~(',NMEIT ~ // / ~ 5+00 TO ST~16+00
~ ~ ~ ~ ~ 5 12/99 ~ ~ BIDDING, CO , ~IM~, JACKS & RNK~ LLP,
1
· ON 0~i96
00+9~ ~iS Ol 00+9
~qaOHd-~d
.
NOTE..'
I. REMO~E AND RESET METAL BEAM GUARD RAIL AS
REOUIRED. NO SEPARATE PAY ITEM.
JOSE k. ESTEVE
VUt. i~1U~1, ~. I:ll P.I. STA. 32+58.07
I A = 1'59:~8'17T.
P.I. STk 30+16.51 N 19298.4410
I", A = 2'20~,5' RT. E 13560.0834
to , wosa.~os7 ~_~. 68 LF. ~ ~,~pz '~ /Ns2~w''4LL
' 1-6= BLOW-OFF
, UG
M B ~GN SIGN MD/~- B~ COHC. ~P-P~ B/~BE~ ~E
P'~e . . ~J'~' x ~ -P- x t x ~ , x ,
=,.~.,~...~ !" ~, ~ .
· 2-6'x8' BOX
'r msr Z2° R.C.P. I
~ ~ ' ,':- ~'5r4.,' z'. ~ ~, "-~]'~;'~"
I N 18900. 76 ~ FURNISH ~ INSTALL ~ 135678149 i ~. E 1355Z5417 '~'
OAKBEND ADDITION ~ L.H. LACY
MALZAHN LANDSCAPE rot, 9406a, P~. 2383 ~ .: rot. 80~80, P~. als7
VOL 87187, PG. 3964 ~ /
~...ALEIHFI~r
CITY OF COPPELL, TEXAS
SANDY LAKE ROAD WATER LINE
PLAN-PROFILE
i.,;...,!J STA. 26+00 TO STA. 34+00
SHIMEK. JACOBS &: FINKLE. A, LLP,
CONSULTING ENGINEERS
D(SGN~ BY:. G.C,H, I PROJECT: 96150 '
26 27 31 32 33 oe~v~l BY:. S.J. & F. DATE: MAY, 1999 4
Z ~ JOSEA. ESTEVE ~
~ V0L 89099, PG. 757 ~ I P'I'°/:'OS~ ~ ~.o.~. ~
P.I ST.~ 43+8794
N 20420. 1360 ~ ~. ~0.,.
I I I I I.
· 1~ + :u.c.,.
~ L.H. LACY
~ 2~ LF 12' i~.L
SCAJ..E IN FED'
CITY OF COPPELL, TEXAS
SANDY LAKE ROAD WATER LINE
PLAN-PROFILE
STA. 34-+00 TO STA. 4-4-+22.4-6
SHIMEX, JACOBS &: RNKLEA, LLP,
CONSULTING FNGINEERS
D~llee, Te~m~
DATE: OE:S,C;NC, BY:. G,C.H, ~ PRO,ECT: 96150 ~ SHE:L;'T
34 35-HX) 36 37 38 39 ~ .40+00 41 42 D,~AWN r,r: S, J. & F. OA'm: MAY, 1999 CF 4 4