Loading...
WA9601B-AG 990608 AGENDA L The City With A Beautiful Future CITY COUNCIL MEETING: June 8, 1999 ITEM # ~7__ ITEM CAPTION: ( Consider approval of Change Order #3 for the Sandy Lake Road Water Line Project #WA 96-01 to Fox Contractors, Inc. in an amoun~..~,rs~}~xceed $250,000; and author~g ~c Mayor m si~. APPROVED SUB~IT~D BY: Ke~e~ ~. Gfi~, ~.~. ~ ~ ~~ ~~ ~ ST~F COUNTS: During easement negotiations for the route to imta~ the 24" water line west ~om State Road to ~e new elevated storage ink, it has become clear ~at the tern of which ~e prope~ owner ~ reques~g is not in ~e best ~terest of the Ci~. Most recent revisions ~om the prope~ omer's representative include lan~age about the waiver of aH ~mre water impaG fees. This is agreeable to the Ci~, however, ~ere is also language concem~g ~e waiver of all ~mre roadway impaa fees for ~e development of ~e land. ~e land itself is approximately 100 a~es and ~e waiver of all ~mre impa~ fees for ~e roadway could be ~e waiver of a substantial doll~ amount. ~e Ci~ needs 53,492 square feet of easement, 116,915 square feet of tempora~ cons~ion easement ~d 13,068 square feet of right-of-way ~om th~ prope~ om~. The City has continued negotiations with the property owners, however, we have also explored other options to install the 24" water line. The suggested change order is to reroute the proposed 24" water line south on State Road to the northern edge of the Wagon Wheel Park property. At that point it is recommended to bore about 468 feet under the existing creek to save the creek and the trees along the creek bank. The remainder of the distance from the creek to the elevated tank would be open cut along the northern edge of the Wagon Wheel Park property; working around as many trees as possible. All easements and right-of-way necessary for the installation of the water line along this route are currently in place. The majority of the amount of the cost associated with this change order is to provide options to $182,500 for the 468 feet of boring under the creek. The final cost of the change order is still being negotiated with the contractor. Staff is still negotiating for easements along the original route and price considerations along the alternate route. However, to provide options to expedite the installation of the water line to ensure that the elevated tank can be supplied with water ~/nd brought on-line as soon as possible, staff recommends approval of the change order in an amount not to exceed $250,000 and authorizing the Mayor to sign. Staff will be available for questions at the Council meeting. BUDGET AMT. $ AMT. EST. $ +X-BID $ FINANCIAL COMMENTS: Funds for this change order will be transferred from the 1997-98 Excess Revenues of the Water/Sewer Fund. DIR. INITIALS: YT FIN. REVIEW} CITY MANAGER REVIEW: Agenda Request Form - Revised 2/99 Document Name: #06082 'l'13ddO~) CITY OF COPPELL, TEXAS Sandy Lake Road Water Line Wagon Wheel Ranch Elevated Tank to Denton Tap CHANGE ORDER NO. 3 A. INTENT OF CHANGE ORDER The intent of this change order is to modify the provisions of entered into between the City of Coppell, Texas and Fox Contractors, Inc., P.O. Box 951, Mi Texas 76065, for construction of the Sandy Lake Road Water Line - Wagon Wheel Elevated Tank to Denton Tap Road, dated December 8, 1998. B. DESCRIPTION OF CHANGE At the request of the City of Coppell, the alignmen 24-inch water line from Station 2+ 15.30 (Start) to Station 45+49.73 (State Road) is hereby revised on revised construction plan sheets 1A through 5. The revised sheets are marked with "Change Number 3" along the lower border and are hereby made a part of this change order by reference. As a '.ult of the re-alignment, the project quantities are revised as shown in Section C of this change order. C. EFFECT OF CHANGE ON This change order will have the follow effect on the cost of this project: Item Description ' Previous Quantity Revised Unit Unit Price Amount of Change No. Quantity This Quantity Change Order 1 24" Water Line including Embedm t 8,533 (2,398) 6,135 L.F. $59.50 $ (142,681.00) (Original Route -Delete) 1R 24" Water Line including Embe ment (Sta. 0 1,707 1,707 L.F. $71.50 $ 122,050.50 24+30 to 44+22) 2 24" Water Line by other th Open 292 (60) 232 L.F. $265.00 $ (15,900.00) Cut(Original Route-Delete 2R 24" Water Line by other an Open Cut (Re- 0 217 217 L.F. $330.00 $ 71,610.00 route) 3R 24" Waterline w/36" 16" Thick Steel 0 468 468 L.F. $390.00 $ 182,520.013 Encase. Pipe (Re-ro e) 7 12" PVC Waterlin with Embedment 304 (54) 2513 L.F. $27.00 $ (1,458.00'~ 10 6" D.I.P. Water ine with Embedment 74 25 991 L.F. $22.00 $ 550.0C 12 182'G~22 5 (1) 4 Ea. $1,000.00 $ (1,000.00~ 13 " 8 1 9 Ea. $600.00 $ 600.00 14 6" Gate Valve 4 (3) 1 Ea. $480.00 $ (1,440.00) 15 8" x 8" Tapping Sleeve and Valve 5 1 6 Ea. $1,900.00 $ 1,900.00 16 12" x 12" Tapping Sleeve and Valve 1 (1) 0 Ea. $2,700.00 $ (2,700.00) j:\clerical\coppellL96-150',specs\change-o\co-3.doc (6/4/99) Page 1 of 2 18 Y' Air &Vacuum Release Valve 4 (1) 3 Ea. $3,500.00 $ (3,500.00'~ 19 6" Blow-Off Valve 4 1 5 Ea. $2,000.00 $ 2,000.00 28 Asphalt Pavement 315 135 450 S.Y. $32.00 $ 4,304.00 Total Amount of Change: $ 216,855.50 Original Contract Amount $912,243.50 Change Order No. 1 17,500.00 Change Order No. 2 23,500.00 Change Order No. 3 216,855.50 Revised Contract Amount $1,170,099.00 B. EFFECT OF CHANGE ON CONTRACT TIME The work required under this change order will not add any calendar days to this project. Original Contract Time 200 calendar days Change Order No. 1 0 calendar days Change Order No. 2 0 calendar days Revised Contract Time 200 calendar days C. AGREEMENT By the signatures below, duly authorized agents of the City of Coppell, Texas and Fox Contractors, Inc., do hereby agree to append this Change Order No. B to the original contract between themselves, dated December 8, 1998. ~X]~i;~;,,co e,, e:!^ Fox Contractors, Inc. Date: 6- $- A~es~ A~est: j:Xclefical\coppell~96-150xspecs\change-o\co-3,doc (6/4/99) Page 2 of 2 SN]3NION30NU,'qRSNOO ',4"1'~ 'V3~HNI4 :~ S803VP 66/~t/s manNonv assyea '~7 A8 a3~Vd3Bd £ 'ON ~3a~o 30NVH3 dVIq NOIJ.V30'I *:l*cl 'uhU.!aO '1~ Ll.l. euueN ~S ~HSRSYlS] ~ [ ~e~zo ~ ~o ~-~s azHv/o~oo~ ~nd srx~z B33NION3 All9 3HZ NO 03578 ION SI OAIV XTNO lO311~ld SII~Z QZ ~/:f133dS 57 1;23/1~Yct Sl/~[ ~tQ:f tf/~,~Lq 3ZYN/(2~/OO3 3/JJ :wON V~ sdmll~qd ADI3 .o~vom , B30VNV~ ALIO ALRd3a 103POad I SqWIqO NOILONBISNO0 0aVONViS nn3aaoo Jo Luo - snw~o IHh~ LU!~ ~[99+/L L 'VIS Ol 00+0 L L 'VIS 3~lJOad-NV~d 00+0 L ' Oi 00+6 'VlS 3nlJO~d-NV~d 0 B3OVNVffi AIIO ~oA 00+99 'VIS O/00+~ 'V/S 3~IJO~d-NV~d 9 S~H~., m. '" ~ ~ JeleeqAh/dJD~ · . _ se6Jn~S >IonNO '! OXDyq AUUD~ ~7 .~3o ~o~ ~,,~ UOSSD~ XUUDa ;, jGi:)uDxelV UDLUJON · LUG/--OJcl NOI/clIBOSqO/33HS 'ON X3aNI 133HS 'liONriO0 },/1:::) G.In)~n-I InJ!~nDG8 V L O-g60 L 0 'ON Ol8 '~> V L 0-96 'oN J. oe[o-~d OVOB dVl NOLN3O :01 39VBOIS 031VA3'13 HONVB 'I33HM NOOVM :~OBJ 9NI1 UqlV/ OVOB 9)1V1 AONVS I ~o~ 6661. 'XY~ .'~va I "~ ~ 'r's ~e ~n~a ~ "' ~ ~ ~ X X X X X X s~3~Nto,~ ~N~ns,oo ~ 00+~ ~S O~ ~'~0+~ 'V~S ~ o~ ~ Ee/z~/g ' 0~ ~l~OBd-N~d ~ , ,i~ ~ ~ ~ ON m3ou<3~mo v 3NR B31VM aVOB 3~ XONYS ~ ~ SVX31 'll3ddO0 ~0 ~110 ~ ~ ~g~ ~ OOg ~ ~ OOg gOg J J ~ ~ gOg . ~ I ~ ~ . ~ i I LBL '~ '~196 ~ J ~ON 3~ O~ n~d~d ~33~ 3~ ~H3dOHd ~d~3 ~ ~ 3~ NO 3N~ ~H3d~d 3~ ~ ~+~ Y~S 7~ . · ~ , , ~0 ZL , . , " , ~ ' ~'~ .~L ~ ~ .... ~o .~ "' ~ ~o. t~ " I 9Z+l YIS 7~ ~7d .t~ ~SI~ 103~8d Sl~ N~3~ ZgZ '~ '6~6g ~ ~3 ~ 3SOP I I Srk m+25 | JOSE A. ESTEVE FURNISH &: IA~ALL VOL 8gOg9, PG. 757 l-J' AIR & V~2UUM ~ RELF_ASE VALVE P.k STA. 7+68 N 183~5.0078 "-~ ~ = 6'266~4" RT. E/2232.5918 ~ N 18314.0036 r t~) 1R, OAK . ) TOP BANK DRAW v.- .............. E 122077679 CITY OF COPPELL ( s.s. ,vo~. VOL. 96164, PG. 197 1. All WORK I$ TO BE CONFINED TO THE SOUTH SlOE OF THE 1 ~ PROWl)' UNE ON THE C. IPI OF ~PP~LL PI?~ THE CI1Y HAS N~T ARRANGED FOR TEMPORARY ACCESS TO THE ADJAO~rT PROPel)' TO THE ~,o / ~,{""-~.~, //'""'~'""""' "' "'-~-_ ' ""'~~'~, ~ 510 505 ~ //-~ "'F" ~ ~ ~ ----.~~. I~,~_ \ 505 '>' i I I '-p-~ .~ --L -'J-- ~oo 495 -241 ~.L oN -16 7ox 495 , ~-- 490 ~ ~ ~i~ ~l~__ ~ 4-90 485 ,~K ,~~ ~ 485 15+00 .~ CITY OF COPPELL, TEXAS 480 ~ ~ ,~~, J SANDY ~KE ROAD WATER LINE c~~GE ~[~ ~. ~ ~ ~~ / ~4 P~-PROFI~ ~ ~% RI~D~(',NMEIT ~ // / ~ 5+00 TO ST~16+00 ~ ~ ~ ~ ~ 5 12/99 ~ ~ BIDDING, CO , ~IM~, JACKS & RNK~ LLP, 1 · ON 0~i96 00+9~ ~iS Ol 00+9 ~qaOHd-~d . NOTE..' I. REMO~E AND RESET METAL BEAM GUARD RAIL AS REOUIRED. NO SEPARATE PAY ITEM. JOSE k. ESTEVE VUt. i~1U~1, ~. I:ll P.I. STA. 32+58.07 I A = 1'59:~8'17T. P.I. STk 30+16.51 N 19298.4410 I", A = 2'20~,5' RT. E 13560.0834 to , wosa.~os7 ~_~. 68 LF. ~ ~,~pz '~ /Ns2~w''4LL ' 1-6= BLOW-OFF , UG M B ~GN SIGN MD/~- B~ COHC. ~P-P~ B/~BE~ ~E  P'~e . . ~J'~' x ~ -P- x t x ~ , x , =,.~.,~...~ !" ~, ~ . · 2-6'x8' BOX 'r msr Z2° R.C.P. I ~ ~ ' ,':- ~'5r4.,' z'. ~ ~, "-~]'~;'~" I N 18900. 76 ~ FURNISH ~ INSTALL ~ 135678149 i ~. E 1355Z5417 '~' OAKBEND ADDITION ~ L.H. LACY MALZAHN LANDSCAPE rot, 9406a, P~. 2383 ~ .: rot. 80~80, P~. als7 VOL 87187, PG. 3964 ~ / ~...ALEIHFI~r CITY OF COPPELL, TEXAS SANDY LAKE ROAD WATER LINE PLAN-PROFILE i.,;...,!J STA. 26+00 TO STA. 34+00 SHIMEK. JACOBS &: FINKLE. A, LLP, CONSULTING ENGINEERS D(SGN~ BY:. G.C,H, I PROJECT: 96150 ' 26 27 31 32 33 oe~v~l BY:. S.J. & F. DATE: MAY, 1999 4 Z ~ JOSEA. ESTEVE ~ ~ V0L 89099, PG. 757 ~ I P'I'°/:'OS~ ~ ~.o.~. ~ P.I ST.~ 43+8794 N 20420. 1360 ~ ~. ~0.,. I I I I I. · 1~ + :u.c.,. ~ L.H. LACY ~ 2~ LF 12' i~.L SCAJ..E IN FED' CITY OF COPPELL, TEXAS SANDY LAKE ROAD WATER LINE PLAN-PROFILE STA. 34-+00 TO STA. 4-4-+22.4-6 SHIMEX, JACOBS &: RNKLEA, LLP, CONSULTING FNGINEERS D~llee, Te~m~ DATE: OE:S,C;NC, BY:. G,C.H, ~ PRO,ECT: 96150 ~ SHE:L;'T 34 35-HX) 36 37 38 39 ~ .40+00 41 42 D,~AWN r,r: S, J. & F. OA'm: MAY, 1999 CF 4 4