Loading...
2002_0509 WATER Issued: 6 1 QZ Finished: 51 9 /0 Z Employee: Grid Map: Name: Address: 1 OS LflIl95:1)NW NE Phone Number (HM): (WK): Check For Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. Repair 3. Maintenance 4. Qtere' Backflow Insp. A. Main Line A. Pump '"A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: OinA/Uc 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter Reading 2 '?5 1 B. New Meter Reading C. Old Meter Size / Type — New Meter Size / Type -'n MST R E. Type of work performed or findings: 9. If mainline or deep service repa.:, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: 12. le you had an accidenu'incide ^.t while perforating this request, did you report it? YES or NO 13. Water Utilities meter inspection: PASS or FAIL 14. How many trips to do task? ignature