Loading...
2002_0509 WATER Issued: S` t t (d ?, Finished S l 6 ( , 0 Z , Employee: Grid Map: Name: Address: I Phone Number (HM): (WK): Check For Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. $eta' 3. Maintenance 4. old Bacldlow Insp. A. Main Line A. Pump - - A. Line Locate' Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: CliwJcie 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered YES NO ' C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # e1 I D-2.1 q l f' Reading /0 L 94 B. New Meter 2-a(e3 l Reading 03 C. Old Meter Size / Type f K �L New Meter Size / Type 57 8" MASTER- E. Type of work performed or findings: 9. Ef mainline or deep service repair, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: l 2. It' you had an accidenu"incident while performing this request, did you report it? S or NO t 3. Water Utilities meter inspection: PASS or FAIL 14. How many trips to do task? _ iI - l ' A /14,- Signakure