Loading...
2002_0521 WATER Issued: Z L Finished: S 2 1 (t) L Employee: Grid Map: Name: Address: 5 .i) I /. P ,.{ 1 Cy Phone Number (HM): (WK): Check For Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. kg& 3. M_ 4. Qhq Backflow Insp. A. Main Line A. Pump • -- A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: )UI LiC1L C ,i'1 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # 9 6, 5-)..6 Reading S B. New Meter ;# ,*j 3 5 Li I Reading 0 C. Old Meter Size / Type i I/ 3 il( -'n- New Meter Size / Type 1 ' 1 'lc - it iZ. E. Type of work performed or findings: 9. It mainline or deep service repair, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: 12. It you had an accident, incident •A performing this request, did you repots it? YES or NO 13. Water Utilities meter inspection: PASS or FAIL p 14. How many trips to do task? Pat/fi tat -.- Signature