Loading...
2002_0520 • WATER Issued: ZD Finished ___5_1212,4"/„Employee: Grid Map: Name: Address: S 17 t ...€7A A l i Phone Number (HM): (WK): Check For Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. $,t 3. Maintenance 4. Backflow Insp. A. Main Line A. Pump • A Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety • 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: 14x c' C. a,.1 X4 8 c 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # 8 en VC(o )$ Reading 1 i t 1S B. New Meter # a10 4 1 -th, Reading C. Old Meter Size / Type New Meter Size / Type ' l"tZ-- E. Type of work performed or findings: 9. [t mainline or deep service repair, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: 12. If you had an accident, incident while performing this request, did you report it? YES or NO 13. Water Utilities meter inspection: PASS or FAIL 14. How many trips to do task? - , c1 (V 1ehr -_