Loading...
2002_0520 WATER Issued: 517.0 16 Finished 5 (24 I f i?, Employee: Grid Map: Name: Address: 5°Z y Phone Number (HM): (WK): Check For: Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read L Backflow Insp. 2. Bait 3. Maintenance 4. Otbei Backflow Insp. A. Main Line A. Puznp A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety, • • 5. Reason for Failure: A Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: M .- f'-1 w I OCR 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified: VERBALLY , DOORKNOCKER 8. If Meter Change Out: A. Old Meter R q OS R 904 Reading - B. New Meter # .2-(,,y! c(.5 Reading C. Old Meter Size / Type ? i s r io New Meter Size / Type ; 1 iv\SI R E. Type of work performed or findings: 9. If mainline or deep service repa.r, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: 12. If you had an accident incident while performing this request, did you report':? YES or NO 13. Water Utilities meter inspection: PASS or FAIL �G 14. How many trips to do task? Sianahirr