Loading...
2002_0520 WATER • Issued: _5424 Z— Finished: 20 mp loyee• , Grid Map: Name: Address: S T Phone Number (HM): (WK): Check For. Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Inso. 2 - Ronk 3. Maintenance 4. gbd Backflow Insp. A. Main Line A. Pump A Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety •• • 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: t/tAT4n -n 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO • C. Was Customer Notified: VERBALLY DOOR MOCKER 8. If Meter Change Out: A. Old Meter T 91 ?2J 72 Reading 1 2.4'4 B. New Meter # �!� <I- /c/R—'1 Reading C. Old Meter Size / Type � RA(3-572— New Meter Size / Type E. Type of work performed or findings: 9. [t mainline or deep service re•a=, describe type of pipe or service line and condition: 10. Man hours: Crew members: 1 1. List materials used: 12. [t you had an accidenu"incider t while performing this request, did you report it? YES or NO 13. Water Utilities meter inspection: PASS or FAIL / 14. How many trips to do task? / `.