Loading...
2002_0520 WATER Issued: 7 Lo 1 Finished St" " (OZ. Employee: Grid Map: Name: Address: 5 5 7 L ,E4U X41 l t Y Phone Number (HM): (WK): Check For Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. hank 3. Maintenance 4. Qt er Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape ��D.LLights E. Other REQUEST FOR SERVICES: of " A.. _ tL t,r✓ 0 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO C. Was Customer Notified VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter R q 3 1.0 1 Reading 3 3' a S B. New Meter # (041 Reading C. Old Meter Size / Type % � s ; nA) New Meter Size / Type #1 MASTela, E. Type of work performed or findings: 9. If mainline or deep service repair, describe type of pipe or service line and condition: 10. Man hours: Crew members: 11. List materials used: 12. If you had an accident; incident while performing this request, did you re or: it? or NO 13. Water Utilities meter inspection: PASS or FAIL 14. How many trips to do task? 4A A, l ti S ignature