Loading...
2002_0514 WATER Issued: I D Finished: S i ll � z- Employee: Grid Map: Name: Address: ..3� /.E /SUl1E Phone Number (HM): (WK) Check For Accuracy Test Meter Leak Check Water Pressure Initial Meter Relocation Inspections Re -Read 1. Backflow Insp. 2. RL 3. Maintenance 4. Old Backflow Insp. A. Main Line A. Pump A. Line Locate Bkflow Cert. Date B. Valves B. Water Tower B. Line Locate Re -Cert. Date C. Service Line C. Samples C. Tap D. Hydrants D. Equipment D. Excavation E. Safety • 5. Reason for Failure: A. Electrolysis B. New Construction C. Poor Installation D. Other 6, List of Safety Equipment at Site (if applicable): A. Barricades B. Cones C. Tape D. Lights E. Other REQUEST FOR SERVICES: c1€ 7. If Meter / Service Leak, Classify: City Customer A. Water Loss (estimate): GPM Fire Plug Flushing Total Gallons B. Was Water Metered: YES NO ' C. Was Customer Notified: VERBALLY DOORKNOCKER 8. If Meter Change Out: A. Old Meter # Reading / B. New Meter # cl Z Reading l" C. Old Meter Size / Type s ag f LL- New Meter Size / Type - E. Type of work performed or findings: 9. If mainline or deep service repa_, describe type of pipe or service line and condition: LL� 0 _ o r4 10. Man hours: Crew members: 11. List materials used: o E p o g O it U d l2. If you had an accident, incident while performing this request, did you report it? YES or - 13. Water Utilities meter inspection: PASS or FAIL `r' pp (1) 14. How many trips to do task? " �� z d Signature ro a 0. 0 a u_